Planner

This manual is for Planner version 3.42.

Copyright © 2001, 2004, 2005, 2006, 2007, 2008, 2009 Free Software Foundation, Inc.
Parts copyright © 2005 Jim Ottaway
Parts copyright © 2005 Dryice Dong Liu

Permission is granted to copy, distribute and/or modify this document under the terms of the GNU General Public License, Version 3.0 or any later version published by the Free Software Foundation. A copy of the license is included in the section entitled “GNU General Public License.”

--- The Detailed Node Listing ---

Installation

Getting the Files

Overview

Getting Started

More about Planner

More about Tasks

Creating New Tasks

Organizing Your Tasks

Task Reports and Overviews

More about Notes

Publishing

RDF Publication

Managing Your Information

E-mail

Scheduling and Time

Diary

Usage

Finances

Contacts and Conversations

Tracking Research and Resources

Tracking Development

Advanced Configuration

Reference Material

Sample Configuration Files


Next: , Previous: Top, Up: Top

1 Preface

This document describes Planner, which was written by John Wiegley and is now maintained by John Sullivan (see Acknowledgements).

This document is a work in progress, and your contribution will be greatly appreciated. Please e-mail comments and suggestions to the mailing list (see Getting Help). In the subject line of your e-mail, include the word ‘Planner’.

This documentation is available in eye-pleasing formats including PDF and HTML at http://wjsullivan.net/static/doc/planner/.

Documentation author and maintainer: John Sullivan john@wjsullivan.net


John Sullivan (johnsu01)
April 25, 2004


Next: , Previous: Preface, Up: Top

2 Introduction

Planner is an organizer and day planner for Emacs. It helps you keep track of your pending and completed tasks, daily schedule, dates to remember, notes and inspirations. It is a powerful tool not only for managing your time and productivity, but also for keeping within easy keystroke reach all of the information you need to be productive. It can even publish reports charting your work for your personal web page, your conscience, or your soon-to-be-impressed boss.

In fact, because it uses as its building blocks simple plain-text files, it is an incredibly modular and flexible tool capable of shaping and handling your personal information in ways whose variety is limited only by your imagination. Because of this, Planner has a very active and generous community who regularly share their innovations with each other. Many of these modules and extensions are included in the archive that you will download. Once you get the basics down, you'll probably want to explore some of them. But as you read this manual and work with Planner, keep in mind that the basic core is actually very simple, and it might be worth spending time with just that before delving into the customizations.

Because they are plain text with very few requirements, the organizer pages kept by Planner can be as basic or as detailed as you like. Your pages can be simple to-do lists with no more additional information than what you would scrawl on a napkin, or they can be a highly technical affair involving hyperlinks, embedded Lisp code, appointment schedules and RSS feeds. As with so much in Emacs, it's all up to you.

To get started with Planner, you first need to download it, and possibly also the packages it depends on (see Installation).


Next: , Previous: Introduction, Up: Top

3 Installation

Planner depends on Muse. Information for downloading and installing Muse can be found at http://mwolson.org/static/doc/muse.html.

Planner and Muse are intended to work with version 21 or later of Emacs and XEmacs.

Make sure that you use the latest Muse release. Development code might prove unstable.


Next: , Previous: Installation, Up: Installation

3.1 Getting the Files

Currently, there are three ways to obtain and install Planner. You can install it from a source archive, git, or Debian package.


Next: , Previous: Getting the Files, Up: Getting the Files

3.1.1 Installing from a Source Archive

You can install Planner from the source archive packaged and distributed directly by the maintainer. This archive is provided in both .tar.gz and .zip format. If you don't know where to extract these archives, create a ~/elisp directory, and extract them there.

  1. Download and unpack either http://mwolson.org/static/dist/planner-latest.tar.gz or http://mwolson.org/static/dist/planner-latest.zip.
  2. Likewise for http://mwolson.org/static/dist/muse-latest.tar.gz or http://mwolson.org/static/dist/muse-latest.zip.
  3. Likewise for http://mwolson.org/static/dist/remember-latest.tar.gz or http://mwolson.org/static/dist/remember-latest.zip.
  4. Edit your ~/.emacs (_emacs on Microsoft Windows).

    Replace /path/to with wherever you extracted the files.

              ;; Add the directories to your load path
              (add-to-list 'load-path "/path/to/muse/lisp")
              (add-to-list 'load-path "/path/to/planner")
              (add-to-list 'load-path "/path/to/remember")
              
              ;; Load planner
              (require 'planner)
    

Updating Your Version

Download a new version and extract it over the old directory. Don't forget to delete any byte-compiled files (*.elc) in the directories (which can be accomplished by running “make clean”) so that the new code will be used.


Next: , Previous: Installing from a Source Archive, Up: Getting the Files

3.1.2 Installing from git

The git version control system allows you to keep up-to-date with the latest changes to the development version of Planner. It also allows you to contribute changes (via commits, if you are have developer access to the repository, or via patches, otherwise). If you would like to contribute to Muse development, it is highly recommended that you use git.

Debian users can install git with apt-get install git-core.

If you are new to git, you might find this tutorial helpful: http://www.kernel.org/pub/software/scm/git/docs/tutorial.html.

Downloading Planner with git and staying up-to-date involves the following steps.

     # Retrieve Muse
     git clone git://repo.or.cz/muse-el.git muse
     
     # Retrieve Planner
     git clone git://repo.or.cz/planner-el.git planner
     
     # Retrieve Remember
     git clone git://repo.or.cz/remember-el.git remember
     
     # If that didn't work (due to a restrictive firewall), then try the
     # following instead:
     #
     # git clone http://repo.or.cz/r/muse-el.git muse
     # git clone http://repo.or.cz/r/planner-el.git planner
     # git clone http://repo.or.cz/r/remember-el.git remember

Then add the following lines to your ~/.emacs:

     ;; Add the directories to your load path
     (add-to-list 'load-path "/path/to/muse/lisp")
     (add-to-list 'load-path "/path/to/planner")
     (add-to-list 'load-path "/path/to/remember")
     
     ;; Load planner
     (require 'planner)

You can also browse Planner's git repository on the web at http://repo.or.cz/w/planner-el.git.

Updating Your Version

To stay up-to-date using git, here are some commands that might be useful.

To list upstream changes not in local copy:

Do this whenever you want to see whether new changes have been committed to Planer. If you wish, you may skip this step and proceed directly to the “update” step.

     # Change to the source directory you are interested in. Example:
     cd muse/
     
     # Fetch new changes from the repository, but don't apply them yet
     git fetch origin
     
     # Display log messages for the new changes
     git log HEAD..origin

“origin” is git's name for the location where you originally got Muse from. You can change this location at any time by editing the .git/config file in the directory where the Planner source was placed.

To update to the latest version:

     cd muse; git pull
     cd ../planner; git pull
     cd ../remember; git pull

Don't forget to either rerun the make command or delete the byte-compiled files (*.elc) in the directories, so that the new code will be used.


Previous: Installing from git, Up: Getting the Files

3.1.3 Installing from Debian

Debian packages for Planner, Muse, and Remember are available in Debian proper as the planner-el, muse-el, and remember-el packages, respectively.

If you wish to try experimental packages, add the following lines to your /etc/apt/sources.list

     deb http://mwolson.org/debian/ ./

Then, do the following steps as root:

     apt-get update
     apt-get install muse-el
     apt-get install planner-el
     apt-get install remember-el

If you get some warning about the key not being trusted, you can either ignore it or do the following.

     gpg --keyserver pgpkeys.mit.edu --recv-key f3a8d319
     gpg -a --export f3a8d319 | sudo apt-key add -

Updating Your Version

If you installed Planner from Debian, do apt-get update; apt-get upgrade to upgrade all packages that can be upgraded, or apt-get update; apt-get install planner-el to upgrade just planner-el.


Next: , Previous: Getting the Files, Up: Installation

3.2 Creating Your Planner

Now that you have installed the files for Planner and Muse, you need to set some options to create your first planner.

Muse thinks in terms of projects. Each project consists of a group of documents and certain information associated with these documents. Planner is organized as a project within Muse. So, you need to tell Muse a bit about it.

Add something like the following code to your .emacs file.

First, give your new Planner project a name. In this case, we use the name, “WikiPlanner”.

     (setq planner-project "WikiPlanner")

Next, add an entry for your project to Muse's master list of projects. Don't forget to use your own name here in place of “WikiPlanner” if you have chosen something different.

     (setq muse-project-alist
           '(("WikiPlanner"
              ("~/Plans"           ;; where your Planner pages are located
               :default "TaskPool" ;; use value of `planner-default-page'
               :major-mode planner-mode
               :visit-link planner-visit-link)
     
              ;; This next part is for specifying where Planner pages
              ;; should be published and what Muse publishing style to
              ;; use.  In this example, we will use the XHTML publishing
              ;; style.
     
              (:base "planner-xhtml"
                     ;; where files are published to
                     ;; (the value of `planner-publishing-directory', if
                     ;;  you have a configuration for an older version
                     ;;  of Planner)
                     :path "~/public_html/Plans"))))

This code should work fine as-is for you as long as the directories you see exist, and as long as you have no other Muse projects besides your planner.

The first directory (~/Plans) is the directory where the source files for your planner will reside. This is the directory where you will actually visit files and edit them. These files must have a “.muse” extension.

The second directory (~/public_html/Plans) is the directory where your planner files will be published by Muse as XHTML (see Publishing).

After you have added this code, make sure to either evaluate it or restart Emacs.


Next: , Previous: Creating Your Planner, Up: Installation

3.3 Components

Now that you have the archive, let's look at what's in it.

There should be three directories, named planner, muse and remember.

In the planner/ directory, you'll see many files with names like planner-gnus.el. These are extra modules and extensions for Planner, which you can use to tailor Planner to fit your desired planning and information management habits.

In the muse/lisp directory, you'll see many files with names like muse-blosxom.el. As in planner/, these are optional modules and extensions.

A minimal working installation includes just planner/planner.el.

You need planner.el because it provides the core functions for handling tasks, notes, and page navigation. You need Emacs Muse because it provides the functions used to display your pages (both in an emacs buffer and as HTML), and for connecting them to each other. More specifically, it enables you to have hyperlinks and formatting in your emacs buffers even though the actual files you are working with are saved in plain text. These abilities are used in Planner to format your planner pages the way you like, to create links from your tasks and notes to the materials and projects they refer to, and to optionally “publish” your pages in different formats, including HTML.

In the remember/ directory are files related to RememberMode. RememberMode does not depend on Planner or Muse, but works best with Planner installed. It is not required in order to use Planner, but it is used by many Planner users to record notes and information to their planner pages.

If you are curious, you can open each file in these directories and read the comments at the top, to get an idea of what each extension is used for. They are also all detailed later in this manual.


Previous: Components, Up: Installation

3.4 Advanced Installation

Once you decide you want to keep Planner around for a while, there are two additional steps you can take to make using it easier and more efficient. These steps are optional.


Next: , Previous: Installation, Up: Top

4 Overview

Planner is a plain-text hyperlinked personal information manager for Emacs that helps you keep track of tasks, notes, and other information. People use Planner to support different ways of planning one's day, from Franklin-Covey and David Allen's Getting Things Done to home-brew hacks. Planner is even used to manage information not normally handled by a personal information manager, like bugtracking, time tracking, and team data. If you start by using Planner as a basic TODO and notes manager, you might find other ways it can help you improve your process.

You can use Planner to keep track of your tasks, schedule, notes, and other information you want to store in hyperlinkable text files. You can get the most benefit out of a personal information manager if you use it everyday. Most people add (plan) to the end of their ~/.emacs so that Planner shows today's schedule and unfinished tasks whenever Emacs starts. If you leave your Emacs running for more than 24 hours, try to get into the habit of running plan at least once a day.

Because your time is important, Planner tries to minimize distractions, making it easier for you to jot down tasks and notes without being distracted from your work. People often make tasks based on the current buffer, so Planner tries to create hyperlinks to whatever you're looking at so that you can jump back to it easily. The Getting Started tutorial will show you how to set that up for both tasks and notes.

The customizability of Planner means you can make your personal information manager truly personal. Planner strives to be as flexible as possible, and we would love to adapt Planner to fit your needs. Browse through our mailing list (see Getting Help) to find out how other people are using Planner, and post your feature requests and bug reports there!

Planner is just a tool. It does not dictate a particular way of planning, although it supports some ways better than it supports others. If you want to take some time thinking about planning, read the following reflections for inspiration and ideas. On the other hand, if you want to hit the ground running, see Getting Started. If you already have a specific way of planning in mind, check out Sample Configuration Files.


Next: , Previous: Overview, Up: Overview

4.1 Planning Based on the Franklin-Covey Approach

(This is an edited and updated version of an essay originally by John Wiegley. Read it if you want to get some insights into one way of planning. You can skip this if you want to go straight to planning your day.)

What is planning? It can be a nebulous thing to define. In its essence, however, it is very simple: it's how we achieve our dreams.

Our days are filled with time, and hence with actions, whether they be of a mental or physical sort. But there are two kinds of action: reactive and creative. Reactive action is a response to the environment, a reaction to stimulus. Had we enough instincts to ensure survival, we could live according to this kind of action alone. It is a mode of behavior we share with every living species.

The opposite to reactivity is creativity, when we decide upon a course of action that is a wholly a product of personal choice. We then make decisions as to the steps needed to make this wish a reality. This is planning. Planning is essentially a creative endeavor at every step.

First, create the idea, what you want to achieve. Very short-term ideas do not need much more than thinking about how to do it. But long-term ideas require planning, since the mind cannot contain all of the details.

Second, decide how the idea maps into the circumstances you find yourself in. Some environments will assist your plan, others hinder it. But step by step, identify every barrier to the realization of your idea, and devise a countermeasure to overcome it. Once you've mapped things out from beginning to end, accounting for unknowables as best you can, you now have your plan.

Third is to break the stages of the plan into parts that are not overwhelming in their complexity. It is at during this phase that a plan is turned into task items, each to be accomplished within the span of one day's time. If a task requires several days, break it up further. The smaller it is, the less your mind will recoil from attempting it.

Fourth is to monitor your progress, identifying problems and correcting for them as you go. Some plans start out unachievable, and remain that way indefinitely, due to a simple lack of observation. If nothing is working for you, change it. Otherwise, your plan is merely a well-crafted wish.

Fifth is just to do the work, and be patient. All good plans take a great deal of time, and *cannot* happen immediately. The groundwork must be laid for each step, or else it will rest on an insecure foundation. If you follow your plan doggedly, applying some time to it each day or week, it will happen. Remember the story of the tortoise and the hare. I've even written a short essay on the necessity of gradual accomplishment, which can be found at http://www.johnwiegley.com/2004/03/advancing-the-process.html.

How can this software help? Computers are ideal for manipulating information, since they allow you to change things without erasing or rewriting. And since all plans change quite a bit during their implementation, a planning program can be very helpful.

Start by installing Planner and Muse (see Installation).

Now, conceive your idea. I can't believe there's nothing you want from life. More peace, time to enjoy the world, an end to war? Everyone wants something. Search deeply, and you will find countless unhoped wishes lurking therein. Choose one for now, and think on it for a while.

Then open a file (using C-x C-f) within the directory you named in your muse-project-alist. Make sure the file has a .muse extension so that Emacs will automatically recognize it as a planner file. Name the file after your plan, such as BetterHealth.muse.

Choose an idea you really want to accomplish. Struggle to differentiate between the things you want because others want them, and the things you want for yourself. It takes quite an effort, and may require a long time before you notice the difference. Many people want to be more healthy to be more attractive, which is an externally driven goal. Unless you really want to accomplish what you envision, the odds are you will fail. Only our own wishes and dreams possess enough personal energy to see themselves to fruition. What happens to many of us is simply that we never become conscious of these dreams: what we love, what we desire most. When I talk to friends, so much of what I hear is things they want because they feel they should want them. There's just not enough energy there to pursue a good plan, because nearly all of it is negative energy.

Do you know what you really want? Don't worry, many people don't. It's not a question anyone really wants us to pursue, because often we don't want what others do; it doesn't contribute to the social welfare, and all that nonsense. Somehow we always forget that what's good for the social welfare now, was someone else's crazy dream a hundred years ago. The human aversion to fundamental change is always one's greatest enemy, so don't waste any time getting bitter about it.

For the sake of argument I assume you really do want to be healthier, because you've fallen in love with the ideal of purity, or you understand the connection between your physical self and the world around you, and how this can open up your spirit to desiring more. I assume. :)

So you're in a Wiki file called BetterHealth. Start typing. Type anything related to your idea: what you think about it, your ideas on it, and especially what the end will look like. If you can't visualize the end, you can't plan, since planning is about drawing a line between now and then.

When you've typed enough to gain a vision of your goal, start drafting what the possible intermediate steps might be. Then stop, get up, walk around, enjoy life, and come back to it. Taking a long time at the beginning is not a bad idea at all, as long as it's not forever.

As you chew on your idea, it will begin to become more and more concrete. You'll have ideas about the smallest pieces, and ideas about the biggest pieces. Keep going until it starts to take shape before you, and you can see yourself in your mind's eye moving from the present into the future. Write down this progression, and the sorts of things you might encounter along the way.

As you continue, you'll naturally discover discrete phases, or “milestones” as managers love to call them. These are very important, because they let you know you're making progress. I recommend having a big party with friends every time you achieve a milestone. A typical plan might have between three and ten.

Between the milestones are the bigger pieces of your plan. You might find it convenient to name these pieces using MixedCase words. Try adding these lines to your .emacs or _emacs file.

     (require 'muse-wiki)
     (setq muse-wiki-allow-nonexistent-wikiword t)

You'll notice that Emacs colors and underlines them for you. Like, FindGoodGym. Hit return on this highlighted word, and you'll find yourself in another, blank file. In this file, start drafting your sub-plan, just as you did with the larger plan. You should find it easier now, since the scope is smaller.

As you break down further, you'll notice simple little things that need to get done. These are your tasks. Every plan is a succession of tasks. The difference from reactivity is that each task is part of the larger plan. This is what it means to be systematic: that everything you do helps further your plan. If you have tasks in your day that contribute to no plan, they are reactive. Of course, life is full of these, but don't let them take up more than 20% of your day. If you allow yourself to be dominated by reactive tasks, you'll regret it at the end of your life. I don't know this personally, but I do know that striving for one's dreams – and seeing them come to fruition – is the greatest joy a man can possess. It is the essence of freedom, of living, of creation. Reactivity is the opposite of this, and serves only to drain our energy and slacken our spirits.

Now that you've thought of a simple task, type C-c C-t. This will ask for a brief description of the task, and when you plan to do it. If you hit <RETURN> at the question ‘When’, it assumes you mean today. It will also pop up a three-month calendar at this question, so you can see where your free days are. Make sure you set the variable mark-diary-entries-in-calendar to ‘t’ in your .emacs (or _emacs) file. This way, you can see which days your appointments fall on. (Read about the Emacs Calendar and Diary in Calendar/Diary.)

     (setq mark-diary-entries-in-calendar t)

Once your task is in there, go back to your plan and keep generating more tasks. Generate them all! Fully describe—as tasks—everything necessary to bring your sub-plan to completion. Don't create tasks for the other sub-plans. You may have good idea of what they'll look like, but don't bother rendering them into tasks just yet. Things will change too much between now and then, for that to be a good use of your time.

Is your sub-plan now rendered into all of the tasks necessary to reach your first milestone? Great! That is the purpose of planner.el. The rest is really up to you. If you find that you keep putting things off, and never do them, that's the surest sign you're planning for someone else's dream, and not your own.

Here are some of the things planner.el can do, to help you manage and track your tasks:

At the beginning of every day, type M-x plan. This will jump you to the top of the most recent task list before today. If you skipped a bunch of days, you'll have to open up those files on your own.

Probably some of the tasks that day won't be finished – that's OK. Learning to properly estimate time is a magical, mystical art that few have mastered. Put your cursor on those undone tasks, and type C-c C-c. This will move them into today's task page. You can jump to today's task page at any time by typing C-c C-n (from a Wiki or planning page). I heartily recommend binding C-c n, to jump you to this page from anywhere:

     (define-key mode-specific-map [?n] 'planner-goto-today)

As you look at your task sheet each day, the first thing to do is to “clock in” to one of them. This isn't necessary, and is only helpful if you're around your computer a lot. But by typing C-c C-i (assuming you have timeclock.el on your load-path), it will log the time you spend working on your sub-plan (see Time Intervals). This is helpful for viewing your progress. Type C-c C-o to clock out.

C-M-p and C-M-n will move a task up and down in priority. Priority is represented by a letter A through C. 'A' tasks mean they must be done that day, or else your plan is compromised and you will have to replan. 'B' means they should be done that day, to further the plan, otherwise things will be delayed. 'C' means you can put off the task if you need to, although ultimately it will have to be done.

For reactive tasks, the letters mean something different: 'A' means you must do it today, or somebody will roast your chestnuts over an open fire. 'B' means you should do it today, or else someone will be practicing patience at the day's end. 'C' means no one will notice if you don't do it.

Again, reactive tasks are ENEMIES OF PLANNING. Really, until you see them that way, circumstances will push you around and steal your life away. We have only so many years to use, and everyone is greedy to take them. It's insidious, almost invisible. A healthy dislike of reactivity will do wonders for organizing your affairs according to their true priority.

The last word that needs to be said concerns “roles”. Every person stands in several positions in his life: husband, employee, manager, etc. These roles will tend to generate tasks not associated with any immediate plan, but necessary to maintain the health and functioning of the role. My suggestion is to keep this the smallest possible number, and fulfill those that remain well. How you decide to apportion your time between pursuing grand designs, and fostering deep relationships, is a personal matter. If you choose well, each will feed the other.

I mention this to point that reactivity is something not exclusively associated with tasks that have no master plan, because being a father, for example, is something that rarely proceeds according to orderly plans. But the role of father itself is its own plan, whose goal is “to be the best one can”, and whose component tasks are spending time on whatever comes up. It is, in a sense, an implicit plan. But reactive tasks follow no plan at all; they are parasites of time that suck the spirit away, whereas properly chose roles actually help fulfill one's own inner needs. At least, this is what I believe.

— Function: plan force-days

Start your planning for the day, beginning with the last day's tasks.

If planner-carry-tasks-forward is non-nil, find the most recent daily page with unfinished tasks and reschedule those tasks to the current day. If force is non-nil, examine all past daily pages for unfinished tasks.

If planner-carry-tasks-forward is nil, visit the most recent daily page. If a daily page for today exists, visit that instead.

If force-days is a positive integer, scan that number of days. If force-days is ‘t’, scan all days.


Previous: Planning based on the Franklin-Covey Approach, Up: Overview

4.2 Why Use Planner?

You can skip this essay if you just want to get started, or read it for some insights into why the previous maintainer is crazy about it.

Why I Use Planner, by Sacha Chua

I thought about why I liked Planner. Planner as a TODO manager isn't particularly special. Although I can assign tasks to categories and see a breakdown of what projects are taking up my time, Evolution and Microsoft Outlook provide more powerful task support. In other task managers, you can e-mail tasks, assign multiple categories and fill in all sorts of metadata. You can even synchronize your tasks with devices like a phone or PDA. So why use Planner?

I realized that integration into my way of life and automatic context clues are what really make planner tasks worth it for me. I don't have to switch to another application to create a task. I can just hit a keyboard shortcut. Planner uses a minibuffer to get the task description. My windows are not rearranged in any way, and I can look at the data that's relevant to a task. Not only that, tasks automatically pick up context clues, like whom I'm talking to on IRC or the file I'm editing at the moment. This cuts down on the explicit context I need to include and makes it easier for me to bring up the task again.

As a scheduler, Planner is also not particularly distinguished. Sure, it can display my ~/diary, but for that matter so can M-x diary. Evolution and Outlook can give me a more graphical view of my time, sync with my PDA, and coordinate my schedule with other people. Those applications support detailed schedule entries with powerful cyclic options. On the other hand, Planner gives me a personal, plain text view and (at least the way I use it) requires me to edit a separate file to add new appointments. (I've defined a few shortcut keys to deal with this.) However, it does have one advantage—my schedule is always loaded. I used to use Outlook on Windows, but having my schedule in a separate application meant that I actually looked at it very rarely, as I had turned off reminders because they got annoying.

Planner's notes, however, are what really convinced me. I can hit a keyboard shortcut from anywhere and type my notes into a buffer which automatically keeps context information. After typing the note, I can then categorize it. I think that the critical thing here is that interruptions—fleeting thoughts—don't break my flow. I can just pop up a remember buffer, stow that thought away somewhere, and go back to it whenever I want. In contrast, creating a note in Outlook means switching out of my application, making a couple of keystrokes, typing the note in, and then switching back. The context switches make it hard to keep track of where I am and what I'm supposed to remember. Not only that, I need to enter context by hand. Even though I can color my notes and reorganize them in Outlook, I find the context switch too expensive. I used to keep notes in other knowledge management tools as well. Some applications allowed me to drag-and-drop links into the current note, and that was cool. But that required a manual action, and those applications didn't feel integrated into my way of working. (Note: You'll need remember.el for this.)

I guess that's why I like Planner. Unlike other organizers which don't know anything about the applications I use, Planner tries its best to integrate into the way I work, and it's easy to extend. Fortunately I do almost all my work in Emacs, so I can think of my organizer as integrated into my e-mail client, Internet Relay Chat client, web browser, file editor and even games. It automatically picks up context clues from these applications and allows me to easily jump back to relevant files. It doesn't distract me. It allows me to key in data and then it gets out of my way.

(That said, it's perfectly okay to use Planner even if you don't live in Emacs.)

The processing that happens in the background is a bonus, and publishing my task list and notes online has greatly helped me. It gives other people a way to see what I'm working on and what I've planned for the future. Occasionally people write in with additional resources and helpful tips. (Again, this is purely optional. Many people don't publish their planner pages. Other people use really fine-grained access control.)

I think the greatest feature of Planner, though, is its user community. Because Planner can be easily modified, we can experiment with a lot of new ideas quickly, and we can tailor Planner to fit our needs. I love checking my ‘planner-el-discuss’ mail and finding out how people have tweaked Planner or would like to tweak Planner, and I've learned a lot by exchanging reflections on organizing one's life.

I really wasn't an organization freak before I started using Planner. I often forgot to do my homework or answer important mail. I still procrastinate now, but at least it's all being kept track of somewhere! I also really like how Planner lets me to gradually improve how I'm doing things, and I feel I've come a long way.

Please try it out! We'd love to hear how Planner can become your personal information manager.


Next: , Previous: Overview, Up: Top

5 Getting Started

At the end of this tutorial, you will be able to use Planner and related modules to keep track of your tasks, schedules and notes, all within the convenience of Emacs.

There are two kinds of pages in a Planner wiki. Day pages show tasks, schedule, and notes for the day, while plan pages organize related tasks and notes into a single page.

If you have not yet added planner to your ~/.emacs, add the following lines:

     (add-to-list 'load-path "/path/to/muse/lisp")
     (add-to-list 'load-path "/path/to/planner")
     (add-to-list 'load-path "/path/to/remember")
     (require 'planner)

This will bring up the most recent day page with unfinished tasks or create a new day page if necessary. By default, planner pages are stored in ‘~/Plans’.


Next: , Previous: Getting Started, Up: Getting Started

5.1 Tasks

Let us start by creating a task labelled

     Join http://mail.gna.org/listinfo/planner-el-discuss/

From anywhere (even this info buffer!), call M-x planner-create-task-from-buffer to create a new task. Fill in the description and choose a date by:

For now, accept the default (‘today’) by pressing <RET>.

You will then be prompted for a plan page. Plan pages gather related tasks and notes, giving you an overview of what you've done so far. You can accept the default TaskPool, create your own plan page, or specify nil to make a task that is not associated with a plan page. For now, accept the default (‘TaskPool’) by pressing RET.

You have created your first task. View today's page with M-x planner-goto-today. You will see a line of the form

     #B  _ Join http://mail.gna.org/listinfo/planner-el-discuss/ (TaskPool)

If you created the task from this page, then there will be an additional annotation:

     #B  _ Join http://mail.gna.org/listinfo/planner-el-discuss/ : Tasks (TaskPool)

The URL, ‘TaskPool’ and ‘Getting Started’ are hyperlinks. You can use TAB and S-TAB to navigate between them and RET to follow the link.

Create more tasks using M-x planner-create-task-from-buffer. This is bound to C-c C-t in planner-mode pages for your convenience. For example, create the following tasks:

Tip: I bind planner-create-task-from-buffer to "F9 t" so that I can easily call it from anywhere. You can do that with this elisp fragment: (global-set-key (kbd "<f9> t") 'planner-create-task-from-buffer)

Next, visit the TaskPool by:

You can see an overview of the tasks as scheduled on different days. Unlike many personal information managers that store all of your data in one file and then perform magic in order to present different views, Planner uses plain text files. The data is duplicated and kept updated by functions. This makes it simpler and easier to modify, because what you see is (almost) what you get. On the other hand, you'll need to get used to either editing both files, or using the built-in functions for editing and updating files. If you prefer not to work with linked tasks, you can configure Planner to use only plan pages or use only day pages.

The TaskPool page should list the tasks you created earlier. Go to the one named Learn how to schedule a task . Type C-c C-c (planner-copy-or-move-task) to schedule the task. Type RET to accept the default (today). Go to the day page by following the link or calling M-x planner-goto (C-c C-j C-d or the menu bar); you will see the newly-created task there. You can also use C-c C-c (planner-copy-or-move-task) to reschedule a task to an earlier or later date.

Well, that task is done. To mark the task as completed, type C-c C-x (planner-task-done). You can also edit the status manually (change _ to X) as long as you remember to call M-x planner-update-task to update the link page as well. Updating relies on the task description being the same, so do not edit this manually.

Quick summary of commands:

You can save your tasks with C-x C-s the same way you save any other file, or Emacs will prompt you to save it when you exit.


Next: , Previous: Tasks, Up: Getting Started

5.2 Schedule

This is free-form. You can put anything you want into this, or remove it from planner-day-page-template entirely. Some people use it to keep track of their plans for the day with tables like this:

     hh:mm | hh:mm | activity
     hh:mm | hh:mm | activity
     hh:mm | hh:mm | activity

Remember, Planner files are just plain text. You can add new sections or remove old ones, or use the suggested sections for entirely different activities.


Next: , Previous: Schedule, Up: Getting Started

5.3 Notes

By default, your Planner pages will have a Notes section. You can put anything you want in this section, or remove it from your planner-day-page-template entirely.

You may be interested in remember-planner.el, part of the Remember package (see see remember-el). You can download Remember at http://gna.org/projects/remember-el/).

remember-planner.el makes it easy to create notes from anywhere in Emacs, and it uses the same context-sensing code that Planner uses. Notes added by remember-planner.el look like this:

     .#1 Headline 00:00
     Body
     
     [[context hyperlink]]

and are outlined at the H2 level in published HTML.

You can easily create context-aware notes if you include the following in your ~/.emacs:

     (require 'remember-planner)
     (setq remember-handler-functions '(remember-planner-append))
     (setq remember-annotation-functions planner-annotation-functions)

Then M-x remember will open a dedicated buffer for you to write your note. If Planner recognizes your current buffer as one with context then it will include a hyperlink at the bottom of the note. The first line of the note is used as a title, so make it short and meaningful. The rest of the text will be used as the body. Try it now by creating a note, perhaps about things you'd like to remember from this tutorial.

Typing C-c C-c after composing will prompt for a plan page to put the note on, with auto-completion. If you don't enter a page, the note will just be saved on today's page. If you do specify a plan page, the note will go on both today's page and on the specified page. Let's try specifying ‘TaskPool’ for the note.

If you look at today's page, you'll find a timestamped note that links to ‘TaskPool’. Likewise, ‘TaskPool’ contains a note that links to today's page. To change the plan page of a note, use planner-replan-note.

If you decide to edit the note on one of these pages after it has been saved, be aware that your changes will not be automatically reflected on the linked page. To update the linked page after editing a note, use M-x planner-update-note.


Next: , Previous: Notes, Up: Getting Started

5.4 Hyperlinks

Planner automatically creates context-sensitive hyperlinks for your tasks and notes when you use planner-create-task-from-buffer and remember.

Blue links indicate URLs and Planner pages that already exist. Red links indicate Planner pages that have not yet been created.

Middle-click or type <RET> on any link to view the link in the current window. Shift-middle-click or type <S-RET> to view the link in another window. <TAB> goes to the next link, while <S-TAB> goes to the previous one.

You can pick up hyperlinks using the planner-annotation-as-kill function.

— Function: planner-annotation-as-kill

Create a context-sensitive hyperlink for the current buffer and copy it to the kill ring. When called with a prefix argument, prompt for the link display name.

You can then paste it into any Planner buffer by using M-x yank or the keyboard shortcut.

Alternatively, you can create hyperlinks by typing them directly, using the syntax defined by Muse. Anything inside double square brackets will be treated as a link. For example, if you type ‘[[GroceryList]]’ in a Planner buffer, you will end up with a link to a page called ‘GroceryList’. see Bare URLs WikiNames and InterWiki links, for more information about Muse syntax.

Hyperlinks are a powerful feature of Planner. You can use them to hyperlink to mail, news, Web pages, and even IRC connections. See the section on Managing Your Information to find out how to enable support for various parts of Emacs. Want to add a new hyperlink scheme? Check out the source code for examples or ask on the mailing list for help.


Next: , Previous: Hyperlinks, Up: Getting Started

5.5 Example Page

An example planner file is given below. You'll notice that Planner does not have a well-defined user interface. Rather, it's free-form and open, allowing you to adapt it to your preferences.

     ----------------------------------------------------------------------
     * Tasks
     
     #B  _ Join http://mail.gna.org/listinfo/planner-el-discuss/ (TaskPool)
     #B  _ Browse through the Planner info manual (TaskPool)
     #B  _ Add (plan) to the end of my ~/.emacs
     #B  X Learn how to schedule a task (TaskPool)
     
     * Schedule
     
     18:00 | 19:00 | Learn how to use Planner
     
     * Notes
     
     Notes are free-form. You can put anything you want into this.
     
     .#1 This is note number one
     
     Notes on note number one!
     
     .#2 This weird ".#2" syntax is used for allout.el enumerated lists
     
     It makes using allout-mode very handy.
     


Previous: Example Page, Up: Getting Started

5.6 Review

That's all you need to know in order to use Planner as a basic TODO and notes manager, but there's a whole lot more. Read through this manual and our mailing list archives (see Getting Help) for lots of wonderful ideas about planning in Emacs!


Next: , Previous: Getting Started, Up: Top

6 More about Planner


Next: , Previous: More about Planner, Up: More about Planner

6.1 Starting with Day Pages

planner-goto-today opens today's page. Day pages are named ‘YYYY.MM.DD’ and contain your notes for the day. They can also be named ‘YYYY-MM-DD’ if you prefer – just customize the value of planner-date-separator.

You should see a file that looks like this:

     * Tasks
     
     
     * Schedule
     
     * Notes

You can type anything you want into this file. You can add or delete sections.

Use the following commands to navigate through day pages:

— Function: plan

Start planning the day. If planner-carry-tasks-forward is non-nil, copy the most recent unfinished tasks to today's page, else open the most recent page.

— Function: planner-goto (C-c C-j C-d)

Prompt for a date using a calendar pop-up and display the corresponding day page. You can specify dates partially. The current year and month are used if omitted from the input. For example, if today is 2004.05.05, then

In the calendar buffer, you can also left-click or press <RET> on a date to select it.

— Function: planner-goto-today (C-c C-j C-j)

Display today's page. Create the page if it does not yet exist.

— Function: planner-goto-tomorrow (C-c C-j C-t)

Goto the planner page days after the currently displayed date. If days is nil, go to the day immediately after the currently displayed date. If the current buffer is not a daily planner page, calculate date based on today.

— Function: planner-goto-yesterday (C-c C-j C-y)

Goto the planner page days before the currently displayed date. If days is nil, go to the day immediately before the currently displayed date. If the current buffer is not a daily planner page, calculate date based on today.

— Function: planner-goto-most-recent

Go to the most recent day with planning info.

— Function: planner-goto-previous-daily-page

Goto the last plan page before the current date. The current date is taken from the day page in the current buffer, or today if the current buffer is not a planner page. Do not create pages if they do not yet exist.

— Function: planner-goto-next-daily-page

Goto the first plan page after the current date. The current date is taken from the day page in the current buffer, or today if the current buffer is not a planner page. Do not create pages if they do not yet exist.

— Function: planner-goto-plan-page page

Opens page in the the planner-project Wiki. Use planner-goto if you want fancy calendar completion.

— Function: planner-show date

Show the plan page for date in another window, but don't select it. If no page for date exists, return nil.


Next: , Previous: Navigation, Up: More about Planner

6.2 More about Tasks

This section is divided into three parts. In the first part, you can read about all the options, strategies and commands to help you efficiently add new tasks to your planner. In the second part, we'll go over all of the aspects of Planner that relate to organizing, editing, rescheduling and viewing the tasks you've already created. Finally, we'll cover some ways to step back and look at various reports and overviews that can be generated from your planner pages.

You may also be interested in tracking time spent on tasks with Timeclock and estimating project completion time with Schedule (also see see schedule.el).


Next: , Previous: More about Tasks, Up: More about Tasks

6.2.1 Creating New Tasks

Planner makes it very easy to quickly add something to your list of tasks. Once you get used to the basics of planner-create-task-from-buffer, you might want to take a closer look at some things in Planner that can help you create new tasks in a way that fits with your system.


Next: , Previous: Creating New Tasks, Up: Creating New Tasks
6.2.1.1 Creating a Task

You can create a task from any buffer in Emacs by invoking M-x planner-create-task-from-buffer.

This command does more than just add an item to your list of tasks. It also connects that item to some useful context information.

If you create a task while viewing any buffer other than a Planner day page, Planner will associate the task with a hyperlink to that buffer. Try it now by creating a task from this Info buffer.

  1. M-x planner-create-task-from-buffer
  2. When prompted for the task name, enter Learn how to change a task's status and press <RET>.
  3. When prompted for the date, press <RET> to schedule the task for today.
  4. When prompted for the project page, press <RET> to accept the default page of ‘TaskPool’. This is a page for tasks not connected to a larger plan.

Planner prompts you for two pieces of information when you ask it to create a task. First, it asks you when you would like to have the task show up in your planner. If you would like it to be scheduled for today, you can just hit <RET>. If you would like it to be scheduled for some day during the current month, you can just enter the date, without the month, like ‘16’. If you would like it to be scheduled for some day in a future month of the current year, you can enter just the month and date, like ‘06.16’. If you would like to schedule something for next year, then enter the full date, like ‘06.16.2005’. If you do not want this task to appear on a day page at all, you can enter ‘nil’.

The second piece of information Planner asks for is the name of the project to associate the task with. In the above example, you associated the task with the project “TaskPool”, which means that you did not want to associate the task with a particular project or goal in your life. Another way to do this is to answer the project prompt by entering ‘nil’. But instead, you might enter ‘LearnPlanner’ as the project. This creates a new page called “LearnPlanner” in your planner directory and places an entry for the task on that page.

The task then exists in two places: once on your day page, to show how it fits into your daily work; and once on a project page, to show how it fits into your larger projects and goals. In the future you might add related tasks like, “Memorize Planner keybindings”. These tasks might be scattered over weeks or months worth of day pages, but as long as you enter the same project name for each, you will have a way to look at them all together on a single project page.

Planner also creates hyperlinks to enable you to easily move back and forth between the day page system and the project page system. Each task on a day page will have a hyperlink to its project page. Each task on a project page will have a hyperlink to its day page.

After using Planner for a while, you may find yourself with quite a few project pages. Keep in mind that completion is enabled at the project prompt when you create a task, so hitting SPC or TAB at the prompt will show you a list of your current project pages.

Once the task is created, you are returned to the buffer you were working in again, Planner gets out of your way, and you can go on about your business. Later on, when you decide to actually work on that “Memorize Planner keybindings” task, you will be able to follow the hyperlink from that task on your day or project page directly to the relevant node in the Planner info file!

By default, M-x planner-create-task-from-buffer creates medium-priority tasks, marked with the letter ‘B’. But you can specify a particular priority or change the default (see Task Priorities).

You don't have to use planner-create-task-from-buffer to create tasks. You can also create new tasks manually by typing them directly on your day or project page in the format Planner expects. You can even still create hyperlinks by using Muse formatting as you manually type the new task (see Hyperlinks). Keep in mind also that tasks do not have to be linked to any other page.

For convenience, planner-create-task-from-buffer is bound to C-c C-t in Planner buffers. You can bind planner-create-task-buffer to a shortcut key. See the manual for your Emacs distribution to find out more about keybinding.

— Function: planner-create-task-from-buffer title date plan-page

Create a new task named title on date based on the current buffer.

With a prefix, associate the task with the current planner page. If you create a task on a date page, you will be prompted for a plan page. If you create a task on a plan page, you will be prompted for a day page. If nil is specified, the task is created only on the current page.

See planner-create-task for more information.

The new task is created at the top or bottom of the first block of tasks on the scheduled day page (if any), depending on the value of planner-add-task-at-end-flag.

— Function: planner-create-task title date annotation plan-page

Create a new task named title based on the current Wiki page. If date is non-nil, makes a daily entry on date, else makes an entry in today's planner page. It's assumed that the current Wiki page is the page you're using to plan an activity. Any time accrued to this task will be applied to that page's name in the timelog file, assuming you use timeclock (see Time Intervals). If annotation is non-nil, it will be used for the page annotation. If plan-page is non-nil, the task is associated with the given page.

With a prefix, associate the task with the current planner page. If you create a task on a date page, you will be prompted for a plan page. If you create a task on a plan page, you will be prompted for a day page. If nil is specified, the task is created only on the current page.

You probably want to call planner-create-task-from-buffer instead.

The new task is created at the top or bottom of the first block of tasks on the scheduled day page (if any), depending on the value of planner-add-task-at-end-flag.


Next: , Previous: Creating a Task, Up: Creating New Tasks
6.2.1.2 Task Priorities

You can set the priority of a task when you create it, rather than waiting to adjust it after the fact. In order to do this, call the function corresponding to the priority you want. You probably want to bind these functions to some keys if you intend to use them much.

Or, you can change the default priority of planner-create-task-from-buffer by customizing planner-default-task-priority.

You can actually use just one general priority, but using more than one color-codes your tasks and gives you a better overview of your day.


Next: , Previous: Task Priorities, Up: Creating New Tasks
6.2.1.3 Task IDs

After loading planner.el, make sure that planner-id.el is in your load path and add this to your .emacs (or _emacs):

     (require 'planner-id)

This module modifies the behavior of planner.el, adding global task IDs so that tasks can be edited and updated. Planner IDs are of the form ‘{{Identifier:Number}}’.

Options

— User Option: planner-id-add-task-id-flag

Non-nil means automatically add global task IDs to newly-created tasks. If nil, use planner-id-add-task-id to add IDs to existing tasks, or planner-id-add-task-id-to-all to add to all tasks on the current page.

— User Option: planner-id-update-automatically

Non-nil means automatically update linked tasks whenever a page is saved. If nil, use planner-update-task to update the linked task. By default, linked tasks are automatically updated.

— User Option: planner-id-tracking-file

File that contains ID tracking data. This file is automatically overwritten.

Functions

The following interactive functions are defined in planner-id.el:

— Function: planner-id-jump-to-linked-task &optional info

Display the linked task page. If info is specified, follow that task instead.

— Function: planner-id-add-task

Add a task ID for the current task if it does not have one yet. Update the linked task page, if any.

— Function: planner-id-update-tasks-on-page &optional force

Update all tasks on this page. Completed or cancelled tasks are not updated. This can be added to write-file-functions. If force is non-nil, completed and cancelled tasks are also updated.

— Function: planner-id-add-task-id-to-all

Add a task ID for all the tasks on the page. Update the linked page, if any.

— Function: planner-id-search-id id

Search for all occurrences of id.

— Function: planner-id-follow-id-at-point

Display a list of all pages containing the ID at point.

— Function: planner-id-follow-id-at-mouse event

Display a list of all pages containing the ID at mouse. event is the mouse event.


Next: , Previous: Task IDs, Up: Creating New Tasks
6.2.1.4 Cyclic Tasks

If there are tasks that you have to do regularly, you can have Planner schedule those tasks automatically.

Make sure that planner-cyclic.el is in your load path and add this to your .emacs (or _emacs):

     (require 'planner-cyclic)

Create a diary file named ~/.diary.cyclic-tasks (or the value of planner-cyclic-diary-file). Here is an example:

     Tuesday #B0 _ Study Japanese
     Friday #B0 _ Study Japanese (JapaneseStudies)

The first will be a plain task, the second will be linked. The first line will automatically create its task every Tuesday, while the second will create it every Friday.

You can schedule tasks in a variety of ways. This module uses the same syntax for specifying when tasks will be scheduled as the Emacs diary uses for appointments and events. See the GNU Emacs Manual, and the GNU Emacs Lisp Reference Manual, for a full description of the possibilities.

By default, planner-cyclic creates multiple tasks if you let tasks build up (that is, the next Tuesday rolls around and you still haven't marked the task as done.) To turn off this behavior:

     (setq planner-cyclic-diary-nag nil)

Functions

planner-cyclic-diary includes the following interactive functions:

— Function: planner-cyclic-create-tasks-maybe

Maybe create cyclic tasks. This will only create tasks for future dates or today.


Next: , Previous: Cyclic Tasks, Up: Creating New Tasks
6.2.1.5 Task Detail

You may find your planner pages getting very full, so that you want to have one broad task entry be linked to a more specific list of sub-tasks. Or, maybe you want to have a number of notes linked to a particular task. This can be done with targets. You can have a task that is really a meta-task:

     #A1  _ Do things in RevelleLog#13 {{Tasks:101}} (RevelleLog)

RevelleLog#13’ could then be a list of sub-tasks in the form of a note, or any kind of note.

Or, instead of pointing to a particular note on ‘RevelleLog’, you could have the whole page be tasks that you enter in manually, without linking them to another page. You can just type them in like this:

     #A1  _ First specific thing to do

This way, the tasks will only appear on this specific project page, and not on any daily page, so you only see them when you want to look up all of the specific tasks associated with ‘#A1 _ Do things in RevelleLog {{Tasks:101}} (RevelleLog)’.

As you can see, the ability to manually enter tasks is one of Planner's nicest features. It allows you to create tasks that are not assigned to a specific date (by manually entering them on a project page with no date) or to a specific project (by manually entering them on a day page with no project). Yet as long as you enter them using the syntax it understands, Planner will continue to recognize them as tasks.

Another way to have a task not be connected to a particular date is to do C-c C-c (planner-copy-or-move-task) and specify ‘nil’ when asked for the date.

If you would like to see a list of all of your unfinished scheduled tasks, do M-x planner-list-unfinished-tasks. It is only intended to give you an overview. Any editing you want to do, like marking tasks complete or editing their description, still needs to be done on one of the tasks' “real” planner pages.


Previous: Task Detail, Up: Creating New Tasks
6.2.1.6 Deadlines

You can use planner-deadline.el to automatically recalculate days to a deadline by adding (require 'planner-deadline) to your ~/.emacs. With the default setup, make your tasks of the form

     #A0 _ Some task {{Deadline: 2004.09.12}}

(Note: There must be at least one space after the colon.)

After you run planner-deadline-update to update task descriptions, the task will be of the form

     #A0 _ Some task {{Deadline: 2004.09.12 - 2 days}}

Options

— User Option: planner-deadline-regexp

Regular expression for deadline data. The special deadline string should be regexp group 1. The date (YYYY.MM.DD) should be regexp group 2.

Functions

— Function: planner-deadline-update

Replace the text for all tasks with deadlines. Deadlines are of the form ‘{{Deadline: YYYY.MM.DD}}’ by default.

— Function: planner-deadline-change &optional date

Change the deadline of current task to date. If date is nil, remove deadline.


Next: , Previous: Creating New Tasks, Up: More about Tasks

6.2.2 Organizing Your Tasks

Okay, now that you've gotten the hang of creating tasks, you're probably facing a really long list of things to do. How can you organize them so that they don't overwhelm you? Planner gives you a number of strategies for dealing with large numbers of tasks.

  1. Arrange your tasks in the rough order you're going to do them.
  2. Use #A, #B and #C task priorities to differentiate between high-priority, normal and low-priority tasks.
  3. Schedule your tasks onto different days.
  4. Group your tasks into plan pages.
  5. Don't schedule all your tasks.
  1. Task order

    To remind yourself to do tasks in a certain order, simply edit the lines so that they're in the order you want. You can use normal editing commands like kill, yank and transpose-line to reorder the tasks, or use <M-p> (planner-raise-task) and <M-n> (planner-lower-task) to rearrange the tasks.

  2. Task priorities

    By default, tasks are created with medium priority (‘#B’). You can make a task high-priority (‘#A’) or low-priority (‘#C’) by manually editing the task and calling M-x planner-update-task to update the linked page. Alternatively, you can use <C-M-p> (planner-raise-task-priority) and <C-M-n> (planner-lower-task-priority) to modify the task and update the linked page.

    You can edit the priority of a task using M-x planner-edit-task-priority, or manually edit it and call M-x planner-update-task to update tasks on the linked page.

  3. Schedule your tasks on different days

    You don't have to do everything today. Is this a task you would rather do tomorrow? Schedule it for then instead. You can specify ‘+n’ or ‘-n’ whenever you are asked for a date, where n is the number of days before or after the current file's date or today. Don't over-procrastinate things, though!

  4. Plan pages

    Plan pages let you group related tasks and notes together for easy reference. For example, you could have a plan page for each major project or goal in your life, like ‘GoodHealth’ or ‘FurtherStudies’.

    Although plan pages start by grouping everything under a ‘* Tasks’ header, you can organize your plan pages in different ways. For example, you can separate groups of tasks with blank lines, and Planner will sort tasks within each group.

  5. Tasks without dates

    Plan pages also allow you to have undated tasks or tasks with no particular deadlines. This keeps your daily task list small and manageable while making it easier for you to find things to do if you have free time. Make sure you check your plan pages regularly so that you don't completely forget about them.

    For automated scheduling of the next task on a plan page after you complete a task, see the section in http://sacha.free.net.ph/notebook/emacs/planner-config.el named “Schedule next undated task from same project”.


Next: , Previous: Organizing Your Tasks, Up: Organizing Your Tasks
6.2.2.1 Associating Tasks with Multiple Projects

You can use planner-multi.el to associate a task with more than one project. That way, you can easily keep GTD-style context lists as well as project-related lists.

To use multiple projects, add the following to your ‘~/.emacs’:

     (require 'planner-multi)

Under GNU Emacs, you can specify multiple projects by separating them with a single space. For example, you can specify planner doc when creating a task to associate the task with those two projects.

Under XEmacs, you can specify multiple projects by typing RET after each entry and terminating the list with another RET. For example, to specify planner and doc, you would type planner RET doc RET RET at the prompt.

If you want to see an overview of all of your tasks as well as project- or context-specific lists, you can set planner-multi-copy-tasks-to-page to your overview page(s). For example, set it to ‘TaskPool’ to be able to see an overview of all of your unfinished tasks. You can also set this to multiple pages such as ‘[[TasksByProject][p]] [[TasksByContext][c]]’ and use planner-trunk.el to sort and organize tasks for easy reference. (see Grouping Tasks)

Options

— User Option: planner-multi-copy-tasks-to-page

Automatically copy newly-created tasks to the specified page.

By default, tasks are removed from planner-multi-copy-tasks-to-page when you call planner-task-done or planner-task-cancelled. If you prefer to keep a copy of the task, remove planner-multi-remove-task-from-pool from planner-mark-task-hook.

If you want to use a different separator instead of spaces, customize the planner-multi-separator variable.

— User Option: planner-multi-separator

String that separates multiple page references.

For best results, this should be something recognized by muse-link-at-point so that links are highlighted separately.


Next: , Previous: Multiple Projects, Up: Organizing Your Tasks
6.2.2.2 Viewing tasks

Review the tasks scheduled for today by typing M-x planner-goto-today. If you created the task from the previous section in this tutorial, you should see a line that looks like

     #A _ Learn how to change a task's status from Tasks (TaskPool)

If you have planner-use-task-numbers set to non-nil, you will see something like the following instead.

     #A0 _ Learn how to change a task's status from Tasks (TaskPool)

From left to right, these are what the symbols mean:

If you click on ‘Tasks’ or press <RET> while your cursor is in the link, Emacs will display the previous info page.

If you select ‘TaskPool’, Emacs will display the ‘TaskPool’ plan page. Plan pages organize your tasks and notes about a project in one file.

Functions

You can use planner-seek-next-unfinished-task to move to the next unfinished task on the current page.

— Function: planner-list-tasks-with-status status &optional pages

Display all tasks that match the STATUS regular expression on all day pages. The PAGES argument limits the pages to be checked in this manner:

Called interactively, this function will search day pages by default. You can specify the start and end dates or leave them as nil to search all days. Calling this function with an interactive prefix will prompt for a regular expression to limit pages. Specify ‘.’ or leave this blank to include all pages.

This function could take a long time.

— Function: planner-list-unfinished-tasks &optional pages

Display all unfinished tasks. pages follows planner-list-tasks-with-status.

— Function: planner-jump-to-linked-task task-info

Display the task page linked to by the current task or task-info.


Next: , Previous: Viewing Tasks, Up: Organizing Your Tasks
6.2.2.3 Modifying Tasks

To select a task, move your cursor to the line containing the task.

Change a task's priority (‘A’, ‘B’ or ‘C’) by editing the line. ‘#A’ tasks are important. ‘#B’ are medium priority. ‘#C’ are low priority. Whenever you save the file or call M-x planner-fix-tasks, tasks are sorted and numbered according to priority and status.

Change a task's status by calling one of the following functions:

After changing the status using a function, look at the ‘TaskPool’ plan page. The task is also updated on the linked page. If you changed the task status manually by replacing the status with another character, you will need to call planner-update-task to update the linked page.

To reschedule a task, call planner-copy-or-move-task (C-c C-c) and choose a new date. You can mark a region and type M-x planner-copy-or-move-region to reschedule all the contained tasks to a different date. Enter ‘nil’ for the date if you don't want the task or group of tasks to appear on any date page at all anymore. This is a good way to “de-schedule” a task for the time being, but still keep it linked to a plan page for possible future scheduling.

To change the plan page associated with a task, call planner-replan-task. Enter ‘nil’ for the plan page if you don't want the task to appear on any plan page anymore. If you precede the command with a prefix argument, the text of the original plan page will appear in the prompt for easy editing.

Since the same task may exist on two or more pages, such as a date page and a plan page, it is dangerous to edit the description of the task by hand. You should not do it unless you want to make the exact same changes on all its linked pages.

Instead of doing this by hand, you should use planner-edit-task-description. This will prompt you for the changes to the task description and then update all the other pages to which the task is linked. Or, you can just use planner-delete-task to remove the task from both pages, and then create it again with the new desired description.

To remind yourself to do tasks in a certain order, simply edit the lines so that they're in the order you want. planner-raise-task and planner-lower-task update the priorities on linked pages automatically. You can organize tasks into groups by putting a blank line between groups of tasks. Planner will maintain the groupings and only sort the tasks within that group.

Functions

— Function: planner-replan-task page-name

Change or assign the plan page for the current task. page-name is the new plan page for the task. Use planner-copy-or-move-task if you want to change the date. With a prefix, provide the current link text for editing.

— Function: planner-raise-task-priority

Change a low-priority task to a medium-priority task and a medium-priority task to a high-priority task (C to B to A).

— Function: planner-lower-task-priority

Change a high-priority task to a medium-priority task and a medium-priority task to a low-priority task (A to B to C).

— Function: planner-raise-task arg

Move a task up arg steps. By default, arg is 1.

— Function: planner-lower-task arg

Move a task down arg steps. By default, arg is 1.

— Function: planner-edit-task-description description

Change the description of the current task, updating the linked page if any.

— Function: planner-delete-task

Delete this task from the current page and the linked page.

— Function: planner-update-task

Update the current task's priority and status on the linked page. Tasks are considered the same if they have the same description. This function allows you to force a task to be recreated if it disappeared from the associated page.

Note that the text of the task must not change. If you want to be able to update the task description, see planner-edit-task-description or planner-id.el.

See planner-install-extra-task-keybindings for additional task-related shortcuts.


Next: , Previous: Modifying Tasks, Up: Organizing Your Tasks
6.2.2.4 Carrying Over Unfinished Tasks

Sometimes you won't be able to cross off all the tasks on your list. Planner makes it easy for you to keep track of things you still have to do by automatically rescheduling unfinished tasks from the past few days. By default, the plan command searches for unfinished tasks from the last three days and reschedules them onto today. If you open Planner every day, this should cover weekends easily.

It's a good idea to start Planner whenever you start Emacs. That way, Planner can help remind you about today's tasks, appointments, and other things. To automatically start Planner whenever you start up Emacs, add the following code to the end of your ~/.emacs:

     (plan)

Now, every time you start Emacs (which should be more or less once a day), you'll see today's page. If you don't finish all the tasks today, you'll see them again tomorrow.

It's a good idea to start Planner every time you start Emacs so that you get reminded about your task list. If you prefer to start Planner manually, remember to call M-x plan every so often to make sure that you don't forget any unfinished tasks. Safe in the knowledge that Planner tasks won't slip through the cracks (unlike little slips of paper that will invariably get mislaid), you can then get on with the rest of your life.

If your increased productivity with Planner leads to a well-deserved two-week vacation, then you'll need to tell Planner to search more days for unfinished tasks. By using M-x plan, you can automatically bring forward tasks over a given number of days or even scan all the days since time immemorial. C-u 15 M-x plan reschedules all unfinished tasks from the last 15 days. C-u -1 M-x plan checks all of your past day pages for unfinished tasks.

Like everything else in Planner, you can adapt M-x plan to your particular way of life. For example, if you find yourself starting up Emacs and Planner every day–including weekends–because it's just so much fun, you can set the planner-carry-tasks-forward to 1. This can make your Emacs startup marginally faster. On the other hand, if you normally start Emacs once a week, you can set it to 7 or 8. If you're worried about tasks dropping off your radar, you can set it to 0. You can set the value of planner-carry-tasks-forward either with <M-x customize-variable RET planner-carry-tasks-forward RET>, or by putting (setq planner-carry-tasks-forward 3) (replacing 3 with the value appropriate for what you want) in your ~/.emacs file.

On the other hand, you might prefer to reschedule tasks yourself. If you set planner-carry-tasks-forward to nil, then M-x plan and (plan) will bring you to the most recent page with unfinished tasks if there is no page for today. You can then use planner-copy-or-move-task and planner-copy-or-move-region to reschedule tasks. This is probably more hassle than it's worth, though, so let Planner take care of this for you.

Options

— User Option: planner-carry-tasks-forward

If non-nil, carry unfinished tasks forward automatically. If a positive integer, scan that number of days in the past. If 0, scan all days for unfinished tasks. If t, scan one day in the past (old behavior). If nil, do not carry unfinished tasks forward.

Functions

— Function: plan &optional force-days

Start your planning for the day, carrying unfinished tasks forward.

If force-days is a positive integer, search that many days in the past for unfinished tasks. If force-days is 0 or t, scan all days. If force-days is nil, use the value of planner-carry-tasks-forward instead, except t means scan only yesterday

— Function: planner-copy-or-move-task date force

Reschedule the task for date. If force is non-nil, the task is moved regardless of status. It also works for creating tasks from a Note. Use planner-replan-task if you want to change the plan page in order to get better completion.

— Function: planner-copy-or-move-region beg end date muffle-errors

Move all tasks from beg to end to date. planner-copy-or-move-region will copy or move all tasks from the line containing beg to the line just before end. If muffle-errors is non-nil, no errors will be reported.


Next: , Previous: Carrying Over Unfinished Tasks, Up: Organizing Your Tasks
6.2.2.5 Task Numbering

By default, tasks are numbered according to their position on the page. Task numbers allow you to refer to tasks using Muse links. For example, the ‘#A1’ task in 2004.08.16 can be referred to as ‘2004.08.16#A1’.

Note that task numbers change every time you re-sort and re-number tasks with planner-fix-tasks. As a result, they are only reliable for references to past tasks.

If you find yourself not using this functionality, you can turn off task numbers by using the following option.

Options

— User Option: planner-use-task-numbers

Non-nil means use task numbers when creating tasks. This allows you to refer to past tasks if your tasks are numbered appropriately. If you set this to nil, you can save space in your plan files.


Next: , Previous: Task Numbering, Up: Organizing Your Tasks
6.2.2.6 Task Ranks

planner-rank.el models Franklin Covey's Urgency and Importance principle. When you think about a task, there are two aspects in consideration: Urgency and Importance. You may want to do the most urgent things first, like answering an email, or you may want to do the most important things first, like reading this manual. Or much better, balance Urgency and Importance and decide what to do.

planner-rank.el can help you balance.

Urgency and Importance are both measured by scores from 0-9. The higher the score, the more you want to do it first. 9 stands for “I should have done this” and 0 stands for “I can forget this”.

If you are using the planner Deadlines feature, the Urgency score is automatically calculated from how many days are left to meet the deadline. By default, it will score 9 if the task is overdue and 0 if the deadline is years away. Please refer to the docstring of planner-rank-deadline-urgency-map-list for detail.

The task rank is calculated from Urgency and Importance scores. As different people balance urgency and importance differently, a number of planner-rank-calculate-rank-* functions are provided. The algorithms vary from a simple average to something like a weighted root mean square deviation.

The aggressive versions of these functions (planner-rank-calculate-rank-*-aggressive) will make sure if one of Urgency and Importance is high, the resulting rank will be high as well. planner-rank-calculate-rank-weighted-* functions weigh the Urgency and Important scores depending on planner-rank-importance-vs-urgency-factor.

Call planner-rank-test-algorithm on each of the functions and check the result tables to see which one you like most, and set it to planner-rank-rank-calculate-function. Alternatively, accept the defaults and tweak them when you get a better feel for ranking.

Once the Rank is calculated, the Task Priorities will be automatically reset. If the Rank is greater than or equal to planner-rank-priority-A-valve, the task priority will be ‘A’, if the Rank is between planner-rank-priority-A-valve and planner-rank-priority-B-valve, the priority will be ‘B’, else it will be ‘C’.

After setting the task importance and deadline, you can leave it as is. As the deadline approaches, the task priority will automatically be raised and the task re-colored to catch your eyes.

If you are using planner-sort-tasks (see see Making Files Pretty), you can set planner-sort-tasks-key-function to one of planner-sort-tasks-by-rank, planner-sort-tasks-by-importance, and planner-sort-tasks-by-urgency.

Options

— User Option: planner-rank-change-hook

Functions to run after planner-rank-change.

— User Option: planner-rank-priority-A-valve

Tasks with rank greater than or equal to this value will be set to priority ‘A’.

— User Option: planner-rank-priority-B-valve

Tasks with rank greater than or equal to this value and less than planner-rank-priority-A-valve will be set to priority ‘B’. Tasks with rank less than this value will be set to priority ‘C’.

— User Option: planner-rank-deadline-urgency-map-list

Defines how to calculate the Urgency score according to how many days are left to meet the deadline.

— User Option: planner-rank-default-importance

Default importance value for newly added rank.

— User Option: planner-rank-default-urgency

Default urgency value for newly added rank.

— User Option: planner-rank-importance-vs-urgency-factor

How much do you think importance is more “important” than urgency. This will be used in planner-rank-calculate-rank-weighted-* functions.

— User Option: planner-rank-rank-calculate-function

Define the function called to calculate rank.

Functions

— Function: planner-rank-change &optional importance urgency

Set the Importance and Urgency of the current task.

— Function: planner-rank-update-current-task

Recalculate rank for the current task.

— Function: planner-rank-update-all

Recalculate rank for all tasks in the current page

— Function: planner-rank-update-all

Recalculate rank for all tasks in the current page


Previous: Task Ranks, Up: Organizing Your Tasks
6.2.2.7 Grouping Tasks with planner-trunk.el

planner-trunk.el helps you automatically group tasks according to a set of rules. It sorts and splits your tasks, adding a blank line between groups of tasks. For example, if today's page looks like this:

     * Tasks
     
     #B   _ Buy milk (GroceryShopping)
     #B   _ Learn how to use planner-trunk (PlannerMode)
     #B   _ Buy a notebook (Bookstore)
     #B   _ Buy cereal (GroceryShopping)
     #B   _ Set up my own planner-trunk rules (PlannerMode)
     #B   _ Customize my stylesheet (MuseMode)
     #B   _ Go for a health checkup (BetterHealth)

then you might want to group the tasks into: planner and muse, shopping list, and other items. If you set up the appropriate rules by customizing planner-trunk-rule-list, planner-trunk.el can automatically rewrite that section line this:

     * Tasks
     
     #B   _ Learn how to use planner-trunk (PlannerMode)
     #B   _ Set up my own planner-trunk rules (PlannerMode)
     #B   _ Customize my stylesheet (MuseMode)
     
     #B   _ Buy milk (GroceryShopping)
     #B   _ Buy a notebook (BookstoreShopping)
     #B   _ Buy cereal (GroceryShopping)
     
     #B   _ Go for a health checkup

In this case, you would set planner-trunk-rule-list to (("." nil ("PlannerMode\\|MuseMode" "Shopping"))).

You can load planner-trunk with M-x load-library RET planner-trunk RET or add (require 'planner-trunk). If you're not yet comfortable with Emacs Lisp, you can use M-x customize-variable RET planner-trunk-rule-list RET to edit this rule using an easy-to-use interface.

WARNING: Do not keep non-task information in the Tasks section. planner-trunk will delete all non-task lines from the Tasks section of your plan page in the process of grouping the tasks.

After you set up planner-trunk-rule-list, use M-x planner-trunk-tasks to try out your rules until you're satistfied.

If you want to do this automatically, you can use (add-hook 'planner-mode-hook 'planner-trunk-tasks) to trigger it automatically whenever you open a Planner page.


Previous: Organizing Your Tasks, Up: More about Tasks

6.2.3 Task Reports and Overviews

Planner provides a number of different ways to generate different presentations of your tasks.


Next: , Previous: Task Reports and Overviews, Up: Task Reports and Overviews
6.2.3.1 Generating Daily Accomplishment Reports

You can use planner-accomplishments.el to get a summary of your task activity for a particular day. The report is grouped by status and plan (on day pages) or date (on plan pages). An example report follows:

     Link        | Unfinished | In progress | Delegated | Completed | Total
     nil         | 1          | 0           | 0         | 6         | 7
     TaskPool    | 1          | 1           | 0         | 3         | 5
     Planner     | 0          | 0           | 1         | 1         | 2
     SchoolWork  | 0          | 0           | 0         | 1         | 1
     Total       | 2          | 1           | 1         | 11        | 15

This lets you see how you balance your time between your projects.

Options

— User Option: planner-accomplishments-section

Header for the accomplishments section in a plan page. Used by planner-accomplishments-update.

— User Option: planner-accomplishments-status-display

Alist of status-label maps also defining the order of display. Used by planner-accomplishments-format-table.

Functions

— Function: planner-accomplishments-insinuate ()

Automatically call planner-accomplishments-update when saving tasks in planner-mode buffers.

— Function: planner-accomplishments-update ()

Rewrite planner-accomplishments-section with a summary of tasks on this page.

— Function: planner-accomplishments-show ()

Display a buffer with the current page's accomplishment report.


Next: , Previous: Accomplishments, Up: Task Reports and Overviews
6.2.3.2 Status Reports

planner-report.el creates a status report for a given timespan. The report itself is just another Planner page in your planner directory. Once generated, it contains tasks and notes culled from active project pages. Tasks are only shown if they are incomplete or were completed within the timespan. Notes are shown if they were created during the timespan. Tasks and notes are grouped together under a heading for their corresponding project.

The idea is you have one of these status reports generated periodically (say, every couple of weeks). Perhaps you use cron to run them automatically and then mail you a reminder that they've been done. Then you can edit the page, adding verbiage where it is needed and removing irrelevant items. This editing process is as easy as editing any other Planner page. Finally, you can publish the page along with the rest of your planner using M-x muse-project-publish.

If you use planner-authz.el, you can tell planner-report.el only to consult project pages that a given list of users (planner-report-authz) can access when generating the report. For example, if you're preparing a status report for your boss, add yourself and him to planner-report-authz. The resulting status report will only contain information the two of you are supposed to have access to, and the report itself will be similarly restricted.

Getting started

Add the following to your .emacs file:

     (require 'planner-report)

Then you can use the following command to generate a status report:

     M-x planner-report-generate

You will be prompted for a beginning and ending date, and then the status report will be generated. You can then edit it to your liking and publish it just like you would the rest of your planner.

Options

— User Option: planner-report-authz

List of users a status report should be restricted to. When status reports are generated, only planner pages accessible by these users will be consulted, and the resulting status report will be similarly restricted.

— User Option: planner-report-pretty-print-plan-pages

If non-nil, pretty print plan pages. If nil, leave page names as-is. This requires that muse-wiki.el be loaded to work properly.

— User Option: planner-report-remove-task-numbers

Remove task numbers when generating status reports.

— User Option: planner-report-replace-note-numbers

If non-nil, a string with which to replace note numbers when generating status reports.

— User Option: planner-report-unfinished-offset

If non-nil, the offset in days from the current date of unfinished tasks to include in the status report. If nil, include all unfinished tasks.

Functions

— Function: planner-report-generate begin end

Generate a status report spanning a period from begin to end. begin and end are in the format YYYY.MM.DD.


Next: , Previous: Status Reports, Up: Task Reports and Overviews
6.2.3.3 Seeing an Overview of Tasks

You can see a list of tasks with planner-tasks-overview.el. Seeing how you've scheduled tasks over the next few days can help you decide when to schedule another task. Table entries will be of the form

date | link | priority status | task-description

Functions

To display the tasks between a set of day pages, use

— Function: planner-tasks-overview start end

Display an overview of your tasks from start to end. If start is nil, start from the very first day page. If end is nil, include the very last day page. You can use planner-expand-name shortcuts here, like +1 or -1. Pressing <RET> at the prompt will use today.

Once in a planner-tasks-overview buffer, you can use the keyboard shortcut <o> to change the overview period.

You can sort the task display with the following functions:

— Function: planner-tasks-overview-sort-by-date

Sort the tasks by date. Keyboard shortcut: <1>

— Function: planner-tasks-overview-sort-by-plan

Sort the tasks by associated plan page. Keyboard shortcut: <2>

— Function: planner-tasks-overview-sort-by-priority

Sort the tasks by priority. Keyboard shortcut: <3>

— Function: planner-tasks-overview-sort-by-status

Sort the tasks by status. Keyboard shortcut: <4>

You can jump to linked tasks with

— Function: planner-tasks-overview-jump other-window

Display the current task. If a prefix argument is supplied, show the task in another window. Keyboard shortcut: <j>

— Function: planner-tasks-overview-jump-other-window

Display the current task in another window. Keyboard shortcut: C-u j

You can view a summary of the tasks in your plan pages with

— Function: planner-tasks-overview-show-summary &optional file-list

Count unscheduled, scheduled, and completed tasks for FILE-LIST. If called with an interactive prefix, prompt for the plan page(s) to display. Load planner-multi.el to be able to specify multiple pages.

Keys

<TAB>, SHIFT-TAB and <RET> navigate links in the usual fashion.


Next: , Previous: Task Overviews, Up: Task Reports and Overviews
6.2.3.4 <tasks> tag

<tasks>’ is replaced by a report of tasks over all day pages in published pages (see Publishing).

     All incomplete tasks
     
     <tasks status="^X">
     
     All completed tasks
     
     <tasks status="X">
     
     All tasks
     
     <tasks>

Warning: this function can be slow, as it checks all the day pages!


Next: , Previous: <tasks> tag, Up: Task Reports and Overviews

6.3 planner-registry

The planner-registry module provides a way to keep track of all the URLs in your projects, and to list them depending on the current buffer. The URLs are defined in muse-url-protocols module from Muse.

If a URL has been created by planner-create-task-from-buffer, going to that buffer and calling planner-registry-show will show you where Planner put the URL.

Getting started

To begin using planner-registry, add the following to your Planner configuration file.

     (require 'planner-registry)
     (planner-registry-initialize)

You must put it after the place where Planner has been loaded in your configuration file.

If you want the registry to be updated each time you save a Planner file, add the following to your Planner configuration.

     (planner-registry-insinuate)

If you don't want to update the registry each time a file is written, you can do it manually with planner-registry-update: it will update the registry for saved Planner/Muse buffers only.

planner-registry does not define any keybindings by default. Its most useful interactive function is planner-registry-show.

Example usage

Say for example that you created a task from an e-mail. Go to that e-mail and call planner-registry-show: it will open a new buffer displaying the files (in a muse links format) where a link to this e-mail has been added.

Options

planner-registry defines the following options.

— User Option: planner-registry-file

The file where planner-registry stores its URL registry.

— User Option: planner-registry-min-keyword-size

The minimum size for keywords.

— User Option: planner-registry-max-keyword-size

The maximum size for keywords.

— User Option: planner-registry-max-number-of-keywords

The maximum number of keywords.

— User Option: planner-registry-ignore-keywords

A list of keywords to ignore.

— User Option: planner-registry-show-level

Level used by the planner-registry-show function. 0 means that this function shows only exact matches. 1 means that this function also shows descriptive matches. 2 (or more) means that this function also shows fuzzy matches.


Previous: planner-registry, Up: Task Reports and Overviews

6.4 planner-zoom

When assessing where you stand in relation to the tasks you have set out for yourself, you might want a way to survey those tasks in groups divided by time periods, like by the week or by the month. You could create all of these overview pages by hand, but if you like to have this kind of overview frequently, you might find manually creating such pages to be tedious and time consuming.

planner-zoom is an optional module designed to make it easy to view your task information grouped by year, quarter, month, week or day.

To install this module, just load it in your .emacs (or _emacs):

     (require 'planner-zoom)

This module will recognize planner pages named according to the following scheme:

year view
2006.Year
quarter view
2006.Quarter2
month view
2006.January
week view
2006.January.Week3
day view
2006.01.02

Keybindings

This module also adds key bindings that you can use when looking at a Planner page to easily jump between the different time-period views.

S-up
Move to the view corresponding to the time period one step larger than the current one. For example, it moves from the weekly view to the monthly view. It calls planner-zoom-iup.
S-down
Move to the view corresponding to the time period one step smaller than the current one. For example, it moves from the weekly view to the daily view. It calls planner-zoom-idown.
S-left
Stay in the same time-period view as the current one, but move one interval earlier. For example, it moves from 2006.January.Week3 to 2006.January.Week2. It calls planner-zoom-iprev.
S-right
Stay in the same time-period view as the current one, but move one interval later. For example, it moves from 2006.January.Week3 to 2006.January.Week4. It calls planner-zoom-inext.

Example usage

Look at the page named 2006.January and then hit S-down which will show 2006.January.Week1. Then hit S-left and S-right to look at 2006.January.Week2, 2006.January.Week3, etc.

Advanced tips and options

You can use any prefix argument with planner-zoom-iup and planner-zoom-idown to have the new view display in a window other than the current one. This also works with a nonnumeric prefix argument and planner-zoom-inext or planner-zoom-iprev. For these two functions, a numeric prefix will specify the number of intervals to move.

If you don't like the default patterns for naming the time-period view pages, you can change them by customizing planner-zoom-regexps.

Some people believe weeks start with Sunday, and some believe they start with Monday. To accommodate both of these colliding worldviews, planner-zoom-first-day-of-week can be customized. Its default value is ‘1’, which is Monday. If you would prefer Sunday, change it to ‘0’. The month to which a week belongs is the month in which the first day of the week falls.

Command reference

— Function: planner-zoom-iup name other-window

Move to the next higher level in the hierarchy. With a prefix argument, show the desired page in the other window.

— Function: planner-zoom-idown name other-window

Move to the next lower level in the hierarchy. If the current date is within the higher-level time range, zoom to the lower level time range that also contains today. Otherwise, just go to the first lower-level time range. With a prefix argument, show the desired page in the other window.

— Function: panner-zoom-inext name num other-window

Move to the next time range at the same level in the hierarchy. With a numeric prefix argument, move by that number of time ranges. With a non-numeric prefix argument, show the desired page in the other window.

— Function: planner-zoom-iprev name num other-window

Move to the previous time range at the same level in the hierarchy. With a numeric prefix argument, move by that number of time ranges. With a non-numeric prefix argument, show the desired page in the other window.


Next: , Previous: More about Tasks, Up: More about Planner

6.5 More about Notes

Planner by default organizes the notes on a planner page so that the most recent note is first. Each note is numbered, with the oldest note labeled ‘.#1’. If you would like to reverse this behavior, look at C-h v planner-reverse-chronological-notes.

Notes are associated with day pages, but can also be associated with plan pages when they are created. A linked note looks like this:

     .#1 Headline (LinkedNote#1)
     Text

You can jump to the linked note with planner-jump-to-linked-note.

Deleting a note can be dangerous, as the notes are automatically numbered. Removing a note could break links in other pages.

Functions

— Function: planner-create-note page

Create a note to be remembered in page (today if page is nil). If planner-reverse-chronological-notes is non-nil, create the note at the beginning of the notes section; otherwise, add it to the end. Position point after the anchor.

— Function: planner-create-note-from-task

Create a note based on the current task and update the current task to link to the note.

— Function: planner-renumber-notes

Update note numbering.

— Function: planner-jump-to-linked-note note-info

Display the note linked to by the current note or note-info if non-nil.

— Function: planner-search-notes regexp limit

Return a buffer with all the notes returned by the query for regexp. If called with a prefix argument, prompt for limit and search days on or after limit.

The following sections include instructions for displaying, manipulating, and navigating your notes efficiently.


Next: , Previous: More about Notes, Up: More about Notes

6.5.1 Using Allout Mode

The format of the notes in Planner works well with Allout mode, which provides helpful commands for navigating and formatting outlines. You can, for example, hide the bodies of all the notes on a page so you can see just their headlines. You can also jump easily from headline to headline, skipping over the bodies in between.

The commands for using Allout mode vary depending on which Emacs version you are using. In either case, type M-x load-library <RET> allout <RET> to start. If you are using Emacs 22 or later, type M-x allout-mode <RET>. If you are using an earlier version of Emacs, type M-x outline-mode <RET>.

The exact commands then available to you differ depending on your Emacs version, but you can view the commands and their keybindings by typing C-h m. In Emacs 22 or later, they will start with allout-, while in previous versions, they will start with outline-.

For more information about using Allout mode, see C-h f allout-mode <RET>.


Next: , Previous: Using Allout Mode, Up: More about Notes

6.5.2 <notes>

<notes>’ is replaced by a list of note headlines when the page is published. For example, the notes tag in the following example will be replaced by the two headlines when published. (see Publishing)

     <notes>
     
     * Notes
     
     .#1 This is a headline
     
     and this is body text
     
     .#2 This is another headline
     
     and this is more body text

<notes>’ is useful if you want to provide a quick summary of blog entries at the top of your page. Just add it to your planner-day-page-template.


Next: , Previous: <notes>, Up: More about Notes

6.5.3 <past-notes>

<past-notes>’ is replaced by an index of note headlines. If start is specified, it lists notes starting from that date. If directory is specified, you can index notes in another planner directory.

     All the notes I've taken in 2004:
     
     <past-notes start="2004.01.01" end="2004.12.31">


Previous: <past-notes>, Up: More about Notes

6.5.4 Note Indices

Make sure that planner-notes-index.el is in your load path and add this to your .emacs (or _emacs):

     (require 'planner-notes-index)

Then you can use tags of the form:

     <planner-notes-index page="2004.03.02">
     <planner-notes-index from="2004.03.01" to="2004.03.31">
     <planner-notes-index limit="10">
     <planner-notes-index page="PlanPage">
     <planner-notes-index-month-table month="2004.03" limit="5">
     <planner-notes-index-month-table month="2004.03">

You can also use the following interactive functions:

planner-notes-index planner-notes-index-days planner-notes-index-weeks planner-notes-index-months planner-notes-index-years (wow!)

These work based on the current date (date of current buffer, or today).

If a single page is specified, this page is scanned for headlines of the form:

      .#1 Headline

The results are presented as a bulleted list.

If from and to are specified, all date pages between them (inclusive) are scanned. If from is omitted, it is assumed to be the earliest entry. If to is omitted, it is assumed to be the latest entry.

If recent is specified, the list includes only that many recent headlines. and the results are presented as a bulleted list.

To customize presentation, you can write a function that generates the appropriate <planner-notes-index> tags. You can also use planner-extract-note-headlines in your own functions.

Functions

The following interactive functions are defined in planner-notes-index.el:

— Function: planner-notes-index &optional from to limit

Display a clickable notes index. If called from a Lisp program, display only dates between from and to. With a prefix arg limit, display only that number of entries.

— Function: planner-notes-index-days days

Display an index of notes posted over the past few days. The list ends with the day of the current buffer or planner-today.

— Function: planner-notes-index-weeks weeks

Display an index of notes posted over the past few weeks. The list ends with the week of the current buffer or planner-today. Weeks start from Sunday.

— Function: planner-notes-index-months months

Display an index of notes posted over the past few months. The list ends with the month of the current buffer or planner-today.

— Function: planner-notes-index-years years

Display an index of notes posted over the past few years. The current year is included.

planner-notes-index.el does not define any keybindings.


Next: , Previous: More about Notes, Up: More about Planner

6.6 Making Files Pretty

By default, planner does a little bit of fancy reformatting when you save a file. Tasks are sorted by priority (ABC) and status (_oP>XC) on day pages. On plan pages, tasks are sorted by priority (ABC), status (XC), and date. Undated tasks are sorted after dated tasks.

Options

— User Option: planner-sort-tasks-key-function

Control task sorting. Some options include planner-sort-tasks-default-key, planner-sort-tasks-basic, planner-sort-tasks-by-date, and planner-sort-tasks-by-link.

— User Option: planner-sort-undated-tasks-equivalent

This option controls the behavior of task sorting on plan pages. By default, the value ‘9999.99.99’ causes dated tasks to be listed before undated tasks. To sort undated tasks before dated tasks, set this to a blank string.

— User Option: planner-sort-tasks-automatically

Non-nil means sort tasks whenever a planner file is saved. On day pages, tasks are sorted by status. On plan pages, they are sorted by status and date. Sorting can take a while.

— User Option: planner-renumber-tasks-automatically

Non-nil means renumber tasks from 1 to N whenever a planner file is saved. This allows you to refer to tasks in previous day pages using anchors like ‘2003.08.12#A1’. If you use this function, make sure planner-use-task-numbers is non-nil so that new tasks are created with task numbers.

— User Option: planner-align-tasks-automatically

Non-nil means align tasks whenever a planner file is saved. This causes the status to line up in a neat column if you have less than 100 tasks.

— User Option: planner-renumber-notes-automatically

Non-nil means renumber the notes. If most of your notes are only on one page, you might like seeing the notes renumbered if you delete a note in the middle. However, if you use a lot of cross-referencing, note renumbering will break those links.

Functions

— Function: planner-sort-tasks

Sort tasks according to planner-sort-tasks-key-function. By default, sort tasks according to priority and position on day pages, and according to status, priority, date, and position on plan pages.

— Function: planner-renumber-tasks

Update task numbering.

— Function: planner-align-tasks

Align tasks neatly. You can add this to write-file-functions to have the tasks automatically lined up whenever you save. For best results, ensure planner-align-tasks is run after planner-renumber-tasks.

— Function: planner-fix-tasks

Sort, renumber and align tasks.


Next: , Previous: Making Files Pretty, Up: More about Planner

6.7 Annotations

The context included when you create a task and the context included when you create a note are gained the same way. It sounds like black magic, but it turns out not to be.

All that happens is, Planner has a list of functions, planner-annotation-functions. When you create a task from a buffer, or remember a note from a buffer, Planner goes through this list from top to bottom. The first one that returns true is the one it uses.

For example, if you're in Wanderlust, and you hit the key you've bound to planner-create-task-from-buffer, it looks at this list and does something like this. Is it an ERC buffer? No. Is it a BBDB buffer? No. Are we in w3m? No. Are we in Wanderlust? Yes. So this function succeeds. It stops searching and runs the annotation function for Wanderlust, which in this case finds out who the message is from and what the message ID of the message is. It then takes those and constructs a link back to that message, with a link title something like ‘Email from Joe Blogs’.

So, you've read the email from Joe Blogs. He's asked you to do something and you've hit your key to add that task to your list of things to do. So what you end up with is a description of the task, and a link back to what made you create the task in the first place.

The same happens with remembering notes, except that it ends up in the ‘* Notes’ section of your page instead.

Options

To change the behavior of annotations, customize the following options:

— User Option: planner-annotation-functions

A list of functions tried in order by planner-create-task-from-buffer and other functions that pick up context. The first non-nil value returned is used as the annotation. To cause an item to not be annotated, return the empty string ‘""’.

— User Option: planner-annotation-strip-directory

File links are usually generated with the full path to the file so that you can easily tell apart files with the same base name. If planner-annotation-strip-directory is non-nil, though, only the base name of the file will be displayed. For example, a link to ‘/foo/bar/baz’ will be displayed as ‘baz’ and hyperlinked to the file.

— User Option: planner-annotation-use-relative-file

If t, always use relative filenames. planner-annotation-use-relative-file can also be a function that takes the filename and returns non-nil if the link should be relative. Filenames are resolved relative to the first directory of your Planner project in muse-project-alist. That is, the created link will be of the form ‘../../somefile’ instead of ‘/absolute/path/to/file’. This can be helpful if you publish your planner files to the Net and your directory structure ensures that relative links resolve the same from your Plan pages and their respective publishing directory.


Next: , Previous: Annotations, Up: More about Planner

6.8 Interactive Lisp with planner-lisp.el

You can include interactive Lisp functions in your planner pages.

First, you need planner-lisp.el. Put this in your .emacs (or _emacs):

     (require 'planner-lisp)

Then, add a link to the Lisp function to your page, like:

     
     [[lisp:/plan][Plan]]
     

This will be rendered as ‘Plan’. Selecting the link will run the plan function interactively.

You can also execute other Lisp expressions. For example:

     [[lisp:/(planner-goto (planner-expand-name "+7"))][Next week]]

planner-lisp.el does not provide any interactive functions or keybindings.


Next: , Previous: Interactive Lisp, Up: More about Planner

6.9 Publishing

You can publish your planner files to a variety of different formats. For example, you can publish your planner in HTML and put it on a normal web server. No special server support is required. This gives you an easy way to keep other people up to date on your tasks, keep a web log, or simply organize information.

Published files are stored in the path specified by muse-project-alist for your Planner project. Just copy the contents of this directory to your web server, and you're all set! Of course, publishing is completely optional.

Here are some more features related to publishing:


Next: , Previous: Publishing, Up: Publishing

6.9.1 Publishing Planner pages

Publishing works by providing Muse with the settings and environment for Planner publishing.

First, make sure that you have set up a proper muse-project-alist (see Creating Your Planner).

Second, add:

     (require 'planner-publish)

to your .emacs (or _emacs).

To publish your entire Planner project, hit C-c C-p (muse-project-publish). To publish just the current buffer, hit C-c C-t (muse-publish-this-file).

To automatically publish files when you save them, add the following code to your ~/.emacs (or _emacs):

     (eval-after-load "muse-mode"
       '(add-hook 'after-save-hook
                 #'(lambda ()
                     (when (planner-derived-mode-p 'muse-mode)
                       (muse-project-publish nil)))
                 nil t))

Styles provided

The following publishing styles are available.

planner-html
Publish Planner pages to HTML.


planner-xhtml
Publish Planner pages to XHTML.


planner-xml
Publish Planner pages to XML.

Options provided

The following options may be customized to enhance your publishing experience.

planner-publish-markup-regexps
List of markup rules for publishing Planner pages.
planner-publish-markup-functions
Specify which function to use for publishing different kinds of markup.
planner-publish-markup-tags
A list of custom HTML-like tags to recognize when publishing.
planner-xml-markup-strings
Strings that are inserted to publish XML markup.
planner-xml-header
Header used when publishing Planner XML files. This may be text or a filename.
planner-xml-footer
Footer used when publishing Planner XML files. This may be text or a filename.
planner-html-markup-strings
Strings that are inserted to publish HTML markup.
planner-html-style-sheet
CSS stylesheet elements used in Planner HTML and XHTML files. This can also be one or more ‘<link>’ tags.
planner-html-header
Header used when publishing Planner HTML files. This may be text or a filename.
planner-html-footer
Footer used when publishing Planner HTML files. This may be text or a filename.
planner-xhtml-header
Header used when publishing Planner XHTML files. This may be text or a filename.
planner-xhtml-footer
Footer used when publishing Planner XHTML files. This may be text or a filename.
planner-html-inner-header
Extra header section that can be embedded within planner-html-header and planner-xhtml-header.
planner-html-inner-footer
Extra header section that can be embedded within planner-html-footer and planner-xhtml-footer.
planner-publish-prepare-regexps
List of markup rules to apply before publishing a page with Planner.
planner-publish-finalize-regexps
List of markup rules to apply after publishing a page with Planner.


Next: , Previous: Publishing Planner pages, Up: Publishing

6.9.2 Publishing Calendars

To publish calendars in your day pages, it is necessary to do two steps.

To display a calendar based on a different day (given here as DAYPAGE), use <calendar page="DAYPAGE">.

To get arrows to previous and next months to show up, use <calendar arrows="t">. The text in planner-calendar-prev-month-button and planner-calendar-next-month-button will be used for the arrows to the previous and next months, respectively.

By default, Muse will not display the arrows properly, due to limitations in the special-escaping algorithm. To work around this, remove the ‘&’ rule from muse-xml-markup-specials, or from muse-html-markup-specials if you are using the 3.02.6 version of Muse.

It is also possible to create a symlink from the current day page to the page name specified by planner-calendar-today-page-name. To accomplish this, add the following to your configuration.

     (eval-after-load "muse-publish"
       '(add-hook 'muse-after-publish-hook
                  'planner-calendar-create-today-link))

Options

— User Option: planner-calendar-prev-month-button

HTML text used for previous month buttons.

— User Option: planner-calendar-next-month-button

HTML text used for next month buttons.

— User Option: planner-calendar-day-header-chars

Number of characters to use for day column header names.

— User Option: planner-calendar-today-page-name

Default name for published today page link.

Functions

— Function: planner-calendar-create-today-link

Add this function to muse-after-publish-hook to create a “today” soft-link to the newest published planner day page, on operating systems that support POSIX ln.


Next: , Previous: Publishing Calendars, Up: Publishing

6.9.3 Authz Access Restriction

planner-authz.el was written by Andrew J. Korty in order to allow the easy restriction of portions of published pages. It uses the HTML::Mason module available on CPAN (http://www.cpan.org). Setting up HTML::Mason is outside the scope of this document. Make sure that it works before trying out planner-authz.el.

planner-authz.el modifies the behavior of muse-project-publish so that published pages follow access modifiers.

This library lets you publish your planner pages while controlling access to certain portions of them to users you specify. When you load this library, you gain access to two additional markup directives to use in your planner pages. The ‘<authz>’ tag lets you restrict access to arbitrary content as follows:

     Here is a sentence everyone should see.  This sentence also
     contains no sensitive data whatsoever.  <authz users="ajk">This
     sentence, however, talks about my predilection for that French
     vanilla instant coffee that comes in the little tin, and I'm
     embarrassed for anyone else to know about that.</authz> And
     here's some more perfectly innocuous content.

You can use ‘<authz>’ tags to mark up entire paragraphs, tasks, notes, and anything else. The tags are replaced with Mason code in the published pages.

The ‘#authz’ directive restricts access to an entire page. A Mason call is added to this page to generate a 403 error when someone not listed tries to access it. Any notes or tasks on a ‘#authz’-protected page are also wrapped in Mason code on linked pages. To add a ‘#authz’ directive to a Muse page, place ‘#authz’ followed by a space-delimited list of users on one line. For example:

     #authz ajk sacha

Getting started

Add the following to your .emacs file to cause M-x muse-project-publish to automatically use planner-authz features.

     (require 'planner-authz)

Diary markup

If your pages have a section with diary entries maintained by planner-appt.el (or by any other means), you can control access to these entries. First, customize planner-section-tagnames to map your diary section ("* Schedule", in this example) to a tag called "diary-section". An example follows.

     (add-to-list 'planner-section-tagnames '("Schedule" . "diary-section"))

If the name of your diary section is "* Diary", you will not need to customize planner-section-tagnames by default.

Then make sure the diary entries you want restricted contain a corresponding plan page name in parentheses, as in the following example.

     10:00 10:30 Meeting with boss (WorkStuff)

Options

— User Option: planner-authz-project-default

Default access list for project pages (not day pages). If a given project page doesn't contain a ‘#authz’ tag, it will receive the access list defined here. If this variable is nil, all users will be allowed to view the page. No corresponding variable is provided for day pages because it doesn't seem like you'd ever want to control access based on what day it was. (But I will accept patches. :) Notes and tasks referencing pages without ‘#authz’ tags will also be restricted to the users listed here.

— User Option: planner-authz-day-note-default

Default access list for notes on day pages not associated with any project. There is way to set a default for notes on project pages for the reason above; they would only be associated with date pages anyway.

— User Option: planner-authz-day-task-default

Same as planner-authz-day-note-default, but for tasks.

Functions

— Function: planner-authz-publish-index

Publish an index for the planner marked up with Mason code. Only those links to pages which the remote user is authorized to access will be shown.


Next: , Previous: Authz Access Restriction, Up: Publishing

6.9.4 RSS Publication

planner-rss.el allows you to publish your notes in the RSS 2.0 XML format for blog syndication. You will also want to customize the following variables:

To manually add the current note to all the matching RSS feeds, invoke planner-rss-add-note. You can specify a filename with the universal prefix, like this: C-u M-x planner-rss-add-note.

If you use the remember-planner.el module to create notes, you can automatically publish new notes to RSS feeds by adding the following code to your .emacs (or _emacs).

     (add-to-list 'remember-planner-append-hook 'planner-rss-add-note t)

Options

— User Option: planner-rss-base-url

Base absolute URL for published blog entries. Should include trailing ‘/’.

— User Option: planner-rss-category-feeds

Rules for automatic categorization of posts and publishing to RSS files. A blog entry is matched against each condition. If it matches the regular expression or the function returns a non-nil value, the blog entry is copied into the specified file.

— User Option: planner-rss-feed-limits

A list of regular expressions that match feed filenames and the size and item limits for feeds that match. For example, you can use ‘(("." nil 10))’ to ensure that all feeds are limited to the 10 most recent items.

Functions

planner-rss.el defines the following interactive functions:

— Function: planner-rss-add-note feed

Export the current note using planner-add-item. If feed is specified, add the entry to the specified file. Else, add the entry to all matching RSS feeds specified by planner-rss-category-feeds.


Next: , Previous: RSS Publication, Up: Publishing

6.9.5 iCal Publication

iCal is an Internet Engineering Task Force (IETF) standard for calendaring and scheduling. http://www.ietf.org/rfc/rfc2445.txt

You can export your tasks to the iCal format using planner-ical. Add (require 'planner-ical) to your ~/.emacs. Then you can use M-x planner-ical-export-page to display the iCal equivalent of tasks on a page, which you can then save to a file.

To export today's tasks to a file in your publishing directory, add the following to your ~/.emacs.

     (planner-ical-export-file
      (planner-today)
      (expand-file-name
        "tasks.ics"
        (muse-style-element :path (car (cddr (muse-project planner-project))))))

Functions

— Function: planner-ical-export-page page &optional file

Export PAGE's tasks in the iCal format. If FILE is non-nil, results are saved to that file. If FILE is nil, results are displayed in a `planner-ical-export-buffer'.

— Function: planner-ical-export-this-page

Display the tasks on the current page in iCal format.


Previous: iCal Task Publication, Up: Publishing

6.9.6 RDF Publication

Put planner-rdf.el in a directory that is in your Emacs load-path and the following into your ~/.emacs file:

     (require 'planner-rdf)
     (eval-after-load "muse-publish"
       '(progn
          (add-hook 'muse-after-publish-hook
                    'planner-rdf-publish-file)
          (add-hook 'muse-after-publish-hook
                    'planner-rdf-publish-index)))


Next: , Previous: RDF Publication, Up: RDF Publication
6.9.6.1 Publishing with planner-rdf

Planner-rdf is now included in the normal Planner publishing process. Pressing <C-p> will create a .owl and a .rdf file for every planner file. Additionally it creates an index, index.rdf.

By default all generated files will be stored in the normal Planner publishing directory, where the HTML files end up. If you would ike to change that, set the variable planner-rdf-directory to the desired location.

The generated files:


Next: , Previous: Publishing with planner-rdf, Up: RDF Publication
6.9.6.2 planner-rdf Tags

Besides the factual information, e.g. the task status or description, planner-rdf extracts links (in the format ‘[[...][...]]’ or ‘[[...]]’) and tags (‘{{...:...’}}) from tasks and notes (including the notes text). Links and tags provide context for the plan elements and so are stored and linked with the containing elements.

Links point to locations that can be used to enrich the information in the Planner pages (e.g, by retrieving data from them and adding it), tags – like the one for the task ids ‘{{Tasks:198}}’ – can be used to express abstract qualities. Some examples:

What tags to use is up to the user. Planner-rdf makes no assumptions about them, it just extracts and stores them. Only the applications using the data know what to do with them.


Previous: planner-rdf Tags, Up: RDF Publication
6.9.6.3 Usage Examples

Report generation with OpenOffice

The Perl file this-week.pl (http://www.rainervolz.de/planner-rdf/this-week.pl) creates a simple report for the current week. The script extracts task and note information from the generated OWL files and inserts it into a simple OpenOffice Writer document. Nothing fancy, just a proof of concept, to show how planner-rdf can be used to integrate Planner Mode with other applications.

Besides Perl and OpenOffice you'll need the Redland RDF Application Framework (http://www.redland.opensource.ac.uk/). It is used to process the RDF data. Redland is small, but powerful, and available for many platforms and languages.

As an example the application loads the RDF data each time it is run. In the real world you probably would use Redland to store the Planner data in a database, to save the loading step each time you access the data.

Importing Planner data into Protege

Protege is a popular ontology editor and knowledge management application. A simple way to import data into it, is to provide a OWL file that contains the data as well as the schema. To do this:

Not the most straightforward process, but it works. The resulting file, here planner2.owl, can then be loaded into Protege.


Previous: Publishing, Up: More about Planner

6.10 Experimental Functions

These functions are experimental. This means that they may not do exactly what you expect them to do, so keep backups, be careful, and don't blame us.

To use these functions, make sure that planner-experimental.el is in your load path, and add this to your .emacs (or _emacs):

     (require 'planner-experimental)

Functions

planner-experimental.el defines the following interactive functions:

— Function: planner-search-notes-next-match

Jump to the next matching entry. Call after planner-search-notes.

— Function: planner-search-notes-previous-match

Jump to the previous matching entry. Call after planner-search-notes.

— Function: planner-remove-duplicates

Remove duplicate tasks.

planner-experimental.el does not define any keybindings.


Next: , Previous: More about Planner, Up: Top

7 Managing Your Information

Planner can be integrated with other Emacs and even some non-Emacs programs by loading additional modules. You can pick and choose from these modules, choosing those that work with programs you use and that produce information you want to have included in your Planner pages.


Next: , Previous: Managing Your Information, Up: Managing Your Information

7.1 E-mail

Planner can work together with several different Emacs e-mail clients. If you load the appropriate module for the e-mail client you use, then your notes and tasks can be annotated with information pointing to the specific e-mail message you were reading when you created that note or task. When you are looking at the note or task, you will be able to jump straight to that message.


Next: , Previous: E-mail, Up: E-mail

7.1.1 Unix mail

This module supports links from any kind of Unix mailbox (mbox). To use this module, make sure that planner-unix-mail.el is in your load path and add this to your .emacs (or _emacs):

     (require 'planner-unix-mail)

Unix mail URLs are of the form:

     ;; mail://PATH/TO/INBOX/message-id

Annotations will be of the form:

     [[mail://PATH/TO/INBOX/E1AyTpt-0000JR-LU%40sacha.ateneo.edu][E-mail from Sacha Chua]]

planner-unix-mail.el does not define any interactive functions or create any new keybindings.


Next: , Previous: Unix mail, Up: E-mail

7.1.2 Gnus

To use this module, make sure that it is in your load path and put this in your .emacs (or _emacs):

     (require 'planner-gnus)
     (planner-gnus-insinuate)

With this module loaded, when you create tasks from Gnus summary or message buffers, the tasks will be annotated with information from the message you were looking at when you created each task. A link will also be created on your planner page that you can select in order to return to the message.

So, the created task will look something like this:

     #A34 _ Send writing to publishme.com from
     [[gnus://alt.books.beatgeneration/<Ifo5c.24632$F9.9567@nwrddc01.gnilink.net>][E-Mail
     from editor@verizon.net]] {{Tasks:71}} ([[Writing]])

This module also binds C-c C-t in the Gnus summary and article views to the command to create a new task.

planner-gnus.el does not define any interactive functions.

For more information about Gnus, see see The Gnus Newsreader.


Next: , Previous: Gnus, Up: E-mail

7.1.3 VM

To use this module, make sure that planner-vm.el is in your load path and add this to your .emacs (or _emacs):

     (require 'planner-vm)

VM URLs are of the form:

     vm://path/to/inbox/message-id

Annotations will be of the form:

     [[vm://home/test/INBOX/<E1AyTpt-0000JR-LU@sacha.ateneo.edu>][E-mail from Sacha Chua]]

planner-vm.el does not define any interactive functions or keybindings.


Next: , Previous: VM, Up: E-mail

7.1.4 Wanderlust

To use this module, make sure that planner-wl.el is in your load path and add this to your .emacs (or _emacs):

     (require 'planner-wl)

Then, when you call M-x planner-create-task-from-buffer from Wanderlust summary or message buffers, the task will be created with the correct annotation.

Keys

To add keybindings to Wanderlust, call:

     (planner-wl-insinuate)

This binds C-c C-t to planner-create-task-from-buffer.


Next: , Previous: Wanderlust, Up: E-mail

7.1.5 MH-E

To use this module, make sure that planner-mhe.el is in your load path and add this to your .emacs (or _emacs):

     (require 'planner-mhe)

Then, when you call M-x planner-create-task-from-buffer from MH-E summary or message buffers, the task will be created with the correct annotation.

planner-mhe does not define any interactive functions.


Previous: MH-E, Up: E-mail

7.1.6 Rmail

To use this module, make sure that planner-rmail.el is in your load path and add this to your .emacs (or _emacs):

     (require 'planner-rmail)

Rmail URLs are of the form:

     rmail://message-id

Annotations will be of the form:

     [[rmail://<E1AyTpt-0000JR-LU@sacha.ateneo.edu>][E-mail from Sacha Chua]]

planner-rmail.el does not define any interactive functions or create any new keybindings.

For more information about Rmail, see see Reading Mail With Rmail.


Next: , Previous: E-mail, Up: Managing Your Information

7.2 Scheduling and Time


Next: , Previous: Scheduling and Time, Up: Scheduling and Time

7.2.1 Diary

If you use Emacs's diary feature, Planner-Diary could be helpful for you. It puts all diary entries for the current day in the ‘* Diary’ section of your day plan page. This section is updated every time you display the file in Emacs. By default the diary section of past pages is not updated; it's pretty unlikely that you want to add new diary entries for the past. (see Diary)

If you want to use planner-diary.el, make sure the file is in your load path and add this to your .emacs (or _emacs):

     (require 'planner-diary)

planner-diary.el needs fancy-diary-display. To use fancy-diary-display, add this to your .emacs (or _emacs):

     (add-hook 'diary-display-hook 'fancy-diary-display)

You can use Planner-Diary in two different ways:

  1. If you want the saved files to contain your entries and not just a line of Lisp, add the following lines to your .emacs (or _emacs):
              (setq planner-diary-use-diary t)
              (planner-diary-insinuate)
    

    You should also customize or set planner-day-page-template to include a ‘* Diary’:

              (setq planner-day-page-template
               "* Tasks\n\n\n* Schedule\n\n\n* Diary\n\n\n* Notes")
    

    C-c C-e updates the diary sections. C-u C-c C-e forces an update—it inserts the diary section for the day, even if the day is in the past or if there is no ‘Diary’ section in the buffer.

  2. (GNU EMACS ONLY) You can put the following line of Lisp code in your day plan pages to display your diary entries:
              <lisp>(planner-diary-entries-here)</lisp>
    

    You can do this automatically for all day plan pages:

              (setq planner-day-page-template
                "* Tasks\n\n\n* Diary\n\n<lisp>(planner-diary-entries-here)</lisp>
              \n* Notes")
    

    When you open a day plan page outside Emacs, you will see the line of Lisp code and not your diary entries.

If you want to see your diary entries for more than just one day, set planner-diary-number-of-days accordingly. This works for either of the two approaches.

These diary sections are only intended for display. Editing them will not affect your diary file. If you want to add entries to your diary, you should use the usual Emacs diary and calendar methods for doing that, or call planner-diary-add-entry.

If you want to use the Cal-Desk package, simply follow the instructions in cal-desk.el. If you get the Cal-Desk layout from the Calendar buffer, you get it in the day plan buffer, too.

If you use Planner-Diary, you might consider using the Calendar support of Planner. (see Calendar/Diary) To get Calendar integration, add this to your .emacs (or _emacs):

     (planner-insinuate-calendar)

If planner-diary-create-section-flag is non-nil, sections are always inserted if necessary.

If you want to import Planner entries into your Diary file, the planner2diary.py script will accomplish this for you. To use it, execute planner2diary.py on the command line, specifying your planner directory as the first and only argument.

Options

— User Option: planner-diary-create-section-flag

Non-nil means create the requested diary sections if they do not exist. By default, planner-diary tries to create the section. If you want more control over your pages, you can set this to nil. Trying to write a diary section to a page that does not have it yet will then result in an error.

By default, planner-diary lists only the appointments you have on that day. If you want the date headers included even when showing the diary entries for a single day, set planner-diary-include-all-output to non-nil.

— User Option: planner-diary-include-all-output-flag

Non-nil means don't omit any data when copying diary entries into day pages.

Functions

planner-diary.el defines the following interactive functions:

— Function: planner-diary-add-entry date time text

Prompt for a diary entry to add to diary-file on date. Uses planner-annotation-functions to make hyperlinks. time and text are used in the description."

— Function: planner-diary-insert-diary force

Insert the fancy diary for the day into the day plan file. If force is non-nil, insert a diary section even if there is no planner-diary-string in the buffer.

— Function: planner-diary-insert-diary-maybe force

Maybe insert the fancy diary for the day into the day plan file. If the current day is in the past and force is nil, don't do anything. If force is non-nil, insert a diary section even if there is no planner-diary-string in the buffer.

— Function: planner-diary-insert-appts force

Insert the diary appointments for the day into the day plan file. If force is non-nil, insert a diary appointments section even if there is no planner-diary-appts-string in the buffer.

— Function: planner-diary-insert-appts-maybe force

Maybe insert the diary appointments for the day into the day plan file. If the current day is in the past and force is nil, don't do anything. If force is non-nil, insert a diary appointments section even if there is no planner-diary-appts-string in the buffer.

— Function: planner-diary-insert-cal-desk force

Insert the cal-desk diary for the day into the day plan file. If force is non-nil, insert a cal-desk diary section even if there is no planner-diary-cal-desk-string in the buffer.

— Function: planner-diary-insert-cal-desk-maybe force

Maybe insert the cal-desk diary for the day into the day plan file. If the current day is in the past and force is nil, don't do anything. If force is non-nil, insert a cal-desk appointments section even if there is no planner-diary-cal-desk-string in the buffer.

— Function: planner-diary-insert-public force

Insert the public diary for the day into the day plan file. If force is non-nil, insert a public diary section even if there is no planner-diary-public-string in the buffer.

— Function: planner-diary-insert-public-maybe force

Maybe insert the public diary for the day into the day plan file. If the current day is in the past and force is nil, don't do anything. If force is non-nil, insert a public appointments section even if there is no planner-diary-public-string in the buffer.

— Function: planner-diary-insert-private force

Insert the private diary for the day into the day plan file. If force is non-nil, insert a private diary section even if there is no planner-diary-private-string in the buffer.

— Function: planner-diary-insert-private-maybe force

Maybe insert the private diary for the day into the day plan file. If the current day is in the past and force is nil, don't do anything. If force is non-nil, insert a private appointments section even if there is no planner-diary-private-string in the buffer.

— Function: planner-diary-insert-all-diaries force

Update all diary sections in a day plan file. If force is non-nil, insert a diary section even if there is no section header. It only inserts diaries if the corresponding planner-diary-use-* variable is ‘t’.

— Function: planner-diary-insert-all-diaries-maybe force

Update all diary sections in a day plan file. If the current day is in the past and force is nil, don't do anything. If force is non-nil, insert a diary section even if there is no section header. It only inserts diaries if the corresponding planner-diary-use-* variable is ‘t’.

— Function: planner-diary-show-day-plan-or-diary

Show the day plan or diary entries for the date under point in calendar. Add this to calendar-move-hook if you want to use it. In that case, you should also remove-hookplanner-calendar-show’ from calendar-move-hook.

Keys

planner-diary.el adds the following keybinding to Planner, if planner-diary-insinuate is in your .emacs (or _emacs):


Previous: Diary, Up: Diary
7.2.1.1 Planner-Diary Advanced Features

The features described here are part of the development version. They are subject to change without notice. They may be buggy. The documentation may be inaccurate. Use at your own risk.

There is a lot of code redundancy in the development version. This is intentional and makes it easier to change the code for one type of diary section without breaking others.

Diary views

Currently Planner-Diary supports six different views of your diary entries:

  1. Ordinary fancy diary display (what you get by pressing d in the calendar buffer with fancy-diary-display switched on)
  2. Schedule/Appointments (all entries from 1 that have a time assigned to them
  3. Diary without appts (1 without 2)
  4. cal-desk display (appts on top, non appts entries at bottom)
  5. A private diary (same as 1, but uses a different diary-file)
  6. A public diary (same as 1, but uses a different diary-file)

Put the following line of Lisp code in your day plan pages to display your diary entries:

     <lisp>(planner-diary-entries-here)</lisp>

The function planner-diary-entries-here takes two optional arguments—the diary file you want to use and the number of days you want to display.

Exporting Planner-specific Diary files

If you would like to export diary entries from your Planner pages to separate Diary files, add (require 'planner-export-diary) to your config. The following steps describe the usage of the functions and options contained in this file.

  1. Customize planner-export-diary-file. The default value is “~/diary.planner”.
  2. Add the following line to your main Diary file (default: “~/diary”).
              #include ~/diary.planner
    
  3. Then, call M-x planner-export-diary-future whenever you want future diary entries published. You can automatically publish entries by adding either of the following to your .emacs.


Next: , Previous: Diary, Up: Scheduling and Time

7.2.2 Appointments

If you would like to use planner for your appointment alerts instead of using the diary system, you might like to try planner-appt.

According to your preferences, you may choose from two different approaches. Appointments in task descriptions on today's plan page are like this:

     #A   _ @12:45 Do something (TaskPool)

and appointments in today's schedule section are like this:

     * Schedule
     
       9:00 | 12:00 | Read Simmel's Philosophy of Money
     @12:45 |       | Do Something Else
     @13:00 | 14:00 | lunch

You can even use both at the same time if you like.

Usage

In the file where you configure Planner, add one of the following.

And finally if you want everything to be updated automatically add:

     (planner-appt-insinuate)

If you don't want to do the insinuation then you can call:

     M-x planner-appt-update

after editing appointments on the page (note that this is not necessary if you use tasks for the appointments and you don't edit the task descriptions outside of planner-edit-task-description).

Try both methods; if you find that you prefer one over the other, use one of the specific planner-appt-use- functions, as there are some performance gains when using one method exclusively.


Next: , Previous: Appointments, Up: Appointments
7.2.2.1 Task-based Appointments

A task has an appointment if it looks like this:

     #A   _ @12:45 Do something (TaskPool)

i.e., if it has @ followed by a time at the beginning. This means the task is a regular appointment, and will not be carried forward at the start of a new day.

Alternatively, it may have a !, like this:

     #A   _ !12:45 Do something else (TaskPool)

This makes it a "nagging" appointment, which will be carried forward. It will, however, lose the appointment time in the process.

This may seem like a strange feature, but here is Henrik's reasoning:

Sometimes I have a task that I want to do at a certain time, so I make it an appointment. If I don't get around to doing it anyway, I want it to be carried forward. Basically, I sometimes use appointments on tasks to annoy me until I get them done. :)

You can edit, move and delete tasks with the usual functions, and appointments will be updated automatically.

You can update all task appointments on your page with

     M-x planner-appt-update
Cyclic Entries

If you have planner-cyclic (see Cyclic Tasks) loaded, entries in your cyclical tasks file such as

     Friday #A _ @12:45 staff meeting

will appear every Friday and there will be an appointment alert set up.

Appointments Section

You can have all task-based appointments copied to a separate section, providing an overview of your appointments.

To do this, add

     (setq planner-appt-task-use-appointments-section-flag t)

to your configuration, or use M-x customize-variable.

The variable planner-appt-task-appointments-section is the name of the section where the appointments will be copied. By default, it is set to "Schedule", which means that task appointments will be intermingled with schedule entries.

It is also a good idea to add the section you wish to use to planner-day-page-template in order to control where that section will appear on the page (otherwise it will appear at the top).

The format of the appointments follows that of a schedule; if you don't like the way it looks, you can write something different and set planner-appt-format-appt-section-line-function appropriately. See the documentation for planner-appt-format-appt-section-line-function for details. It should be fairly easy to see what needs to be done if you look at the source for the default function (which is planner-appt-format-appt-section-line).

If the section specified in planner-appt-task-appointments-section is the same as the schedule section specified in planner-appt-schedule-section (by default "Schedule"), the default formatting function adds a ‘#’ to the description so that one can visually distinguish appointments from the task list from those that have been added to the schedule.


Next: , Previous: Task-based Appointments, Up: Appointments
7.2.2.2 Schedule-Based Appointments

Some scheduled tasks require reminders, others don't. In this schedule:

     * Schedule
     
     9:00   | 12:00 | Read Simmel's Philosophy of Money
     @12:45          Do Something Else
     @13:00 | 14:00 | lunch
     @14:30 |       | Meet jrs to discuss his dissertation
     @16:00           Test Society seminar
     18:00            go home

those that have an @ prefix will be added to the appointment reminder list; the others will not. The formats that are recognized are fairly flexible, as you can see from the example.

If you change your schedule, you can update the appointment list with

     M-x planner-appt-update

You can also have the schedule sorted as part of the update, if you have this in your configuration:

     (setq planner-appt-sort-schedule-on-update-flag t)
Cyclical Entries

You can also have cyclical schedule entries(see Cyclic Tasks) if you add

     (planner-appt-schedule-cyclic-insinuate)

to your configuration.

If you put an entry in your cyclical task file like this

     Friday @12:45 | 13:45 | Staff Meeting

then it will appear in your schedule every Friday, and an appointment alert will be set up.


Next: , Previous: Schedule-based Appointments, Up: Appointments
7.2.2.3 Viewing Appointments

The command planner-appt-show-alerts will show all appointment alerts currently scheduled.

Functions

There are two commands that show appointments in the future; the one displays them in a pop-up buffer, the other puts the information into the current day page.

— Command: planner-appt-forthcoming-display &optional days

Display a buffer of appointments for today and the next days. Optional prefix argument days is the number of days ahead to look. Its default value is defined by planner-appt-forthcoming-days.

— Command: planner-appt-forthcoming-update-section &optional days

In today's plan page, add or update a list of forthcoming appointments. Optional prefix argument days is the number of days ahead to look. Its default value is defined by planner-appt-forthcoming-days. The section heading to use is defined by planner-appt-forthcoming-appt-section.

Options

— User Option: planner-appt-forthcoming-days

The number of days to look ahead for forthcoming appointments. The default value is seven days.

— User Option: planner-appt-forthcoming-appt-section

The name of the section to use for inserting a list of forthcoming appts. The default value is "Forthcoming Appointments".

— User Option: planner-appt-forthcoming-show-day-names-flag

When non-nil (the default), day names will be shown in forthcoming appointments.

— User Option: planner-appt-forthcoming-repeat-date-string

String to insert for repeated dates.

When there are multiple appointments for a date, the date is inserted in the first appointment and the others have this string in their date cell.

If the string consists of anything other than whitespace, then a link to the day page for the appoinment is created.

— User Option: planner-appt-forthcoming-look-at-cyclic-flag

When non-nil, find forthcoming appointments in the cyclic diary file (see Cyclic Tasks) as well as in plan pages. Default is ‘t’.


Next: , Previous: Viewing Appointments, Up: Appointments
7.2.2.4 Appointment Updating on Save

Options

— User Option: planner-appt-update-appts-on-save-flag

When non-nil, update appointment reminders whenever today's plan page is saved. Default value is ‘nil’.


Next: , Previous: Appointment Updating on Save, Up: Appointments
7.2.2.5 Appointment and Calendar Integration

Not strictly part of appointment handling, but if one isn't using the diary, marking dates with plan pages seems to make sense.

Functions

— Function: planner-appt-calendar-insinuate

Add a hook to diary display so that dates in the calendar that have day pages are highlighted


Previous: Appointment and Calendar Integration, Up: Appointments
7.2.2.6 Appointment Hooks

Options

— Hook: planner-appt-update-hook

Hook run after planner-appt-update has updated the appointment list.


Next: , Previous: Appointments, Up: Scheduling and Time

7.2.3 Timeclock

This module allows you to clock in and clock out of your projects (see Time Intervals) You can also generate reports with the <timeclock-report> tag. You may want to read the “Keeping Track of Time” page to see how you can use planner-timeclock to produce detailed reports; See Keeping Track of Time.

timeclock.el is part of GNU Emacs. If you are using XEmacs, please use the version of timeclock.el that comes with Planner in the contrib directory.

With planner-timeclock.el loaded, planner-task-in-progress clocks in a task. To clock out, use planner-task-done or timeclock-out.

planner-timeclock.el defines the following keybindings:

If you use timeclock a lot, you may also be interested in Dryice Liu's planner-timeclock-summary.el, which produces timeclock reports for planner files.

Here is a sample report:

     Project               |     Time| Ratio| Task
     PlannerMaintenance    |  0:03:58|  1.1%| Merge doc patch
                           |  0:17:09|  5.0%| Track down subdirectories
                           |  0:18:11|  5.3%| Merge planner-timeclock-summary-proj.el
                    Total: |  0:39:18| 11.4%|
     JapanCaseStudy        |  2:37:56| 45.6%| Prototype search result page
                           |  0:31:50|  9.2%| Update design documents
                    Total: |  3:09:46| 54.8%|
     ChristmasLetter       |  1:46:37| 30.8%| Write and send my Christmas letters
                    Total: |  1:46:37| 30.8%|
     LinuxPeople           |  0:10:29|  3.0%| Send questions for Linux in Education
                    Total: |  0:10:29|  3.0%|

If you add (require 'planner-timeclock-summary) to your ~/.emacs, you can then use it in two ways.

planner-timeclock-summary-proj.el produces task / time breakdowns on plan pages. Reports are of the form:

     TASK 0 | duration
     TASK 1 | duration
      TOTAL | duration.

To use, add (require 'planner-timeclock-summary) to your ~/.emacs. Call planner-timeclock-summary-proj-current from a project page. The report is inserted at the current position in the buffer. The function planner-timeclock-summary-proj-section does the same but the report is inserted inside a section called ‘* Report’.


Previous: Timeclock, Up: Scheduling and Time

7.2.4 schedule.el

planner-schedule.el allows you to project task completion time. Tasks should be of the form:

     #A0 _ 2h Do something
     #B0 _ 1h30m Do something
     #B0 _ 2d Do something
     #B0 _ 2w Do something
     #B0 _ 10s Do something
     
     s: seconds, m: minutes, h: hours, d: days, w: weeks

schedule.el is included with Planner in the contrib directory, but you can alternatively get it from http://www.newartisans.com/johnw/Emacs/schedule.el if desired.

schedule.el provides a single Lisp function, schedule-completion-time. It takes an Emacs time object and a quantity of seconds. It returns an Emacs time object that represents when the given number of seconds will be completed, assuming that work can only be done during work hours.

The available work hours are affected by several factors:

  1. If timeclock.el is being used, the amount of time left in the current work day (timeclock-workday-remaining) (see Time Intervals)
  2. The amount of time in each work day (schedule-workday)
  3. The definition of a work week (schedule-week)
  4. Any holidays defined in the Emacs calendar (see Holidays)
  5. Any appointments in the Emacs diary (see Appointments)

Taking all of the “block out” periods into account, schedule-completion-time will compute when the given number of seconds will be done, based on your current definitions of time available.

As an example, here's a function which, given a list of durations in seconds, will return a list of completion times starting from the current moment:

     
       (defun compute-completion-times (&rest durations)
         ``Compute completion times for a list of DURATIONS (in seconds).''
         (let ((now (current-time)))
           (mapcar
            (function
             (lambda (dura)
               (setq now (schedule-completion-time now dura))))
            durations)))
     

To call this function, do:

     
     (compute-completion-times 3600 7200 3600)
     

Keys

planner-schedule.el defines the following keybindings:

C-c RET is bound to planner-schedule-show-end-project. C-c C-m is also bound to planner-schedule-show-end-project.

In XEmacs, planner-schedule-show-end-project is bound to C-c C-T c-e and C-c C-S-t C-e.

Functions

planner-schedule.el defines the following interactive functions:

— Function: planner-schedule-show-end-project

Display the estimated project completion time.

schedule.el does not define any interactive functions, or keybindings.


Next: , Previous: Scheduling and Time, Up: Managing Your Information

7.3 Finances

Currently, Planner provides one module dedicated to tracking your finances. This module works with a program called Ledger.


Previous: Finances, Up: Finances

7.3.1 Ledger

planner-ledger.el provides integration between planner and John Wiegley's ledger accounting program, which can be found at http://newartisans.com/johnw/ledger.tar.gz.

To use planner-ledger to insert a ledger balance overview and a list of pending transactions into planner day pages, make sure that your day page includes sections that match planner-ledger-balance-regexp and planner-ledger-pending-regexp. Example:

     * Tasks
     
     * Ledger
     
     ** Pending transactions
     
     * Notes
     

You can manually update ledger sections with the planner-ledger-insert-maybe command.

You can also automatically update ledger sections with the following hook:

     (add-hook 'planner-goto-hook 'planner-ledger-insert-maybe)

You can create ledger entries from specially-formatted tasks using planner-ledger-add-entry-from-task. Tasks should be of the form ‘payment due: payee, amount [comment]’. Example:

     #A1 _ payment due: foobar, $1000.00 some comment here
     #A2 _ payment due: baz, 1000.00

Options

— User Option: planner-ledger-balance-accounts

List of accounts to be included or excluded from the balance overview. ‘+’ includes all matching accounts, and ‘-’ excludes matching accounts. See the documentation for ledger-run-ledger for more details.

— User Option: planner-ledger-balance-regexp

Regular expression matching section for ledger balance. Do not store other data in this section, as it will be overwritten.

— User Option: planner-ledger-pending-regexp

Regular expression matching section for ledger balance. Do not store other data in this section, as it will be overwritten.

— User Option: planner-ledger-payment-task-regexp

Regular expression matching special ledger tasks.

Functions

— Function: planner-ledger-insert-maybe

Update any ledger sections on the current page.

— Function: planner-ledger-add-entry-from-task

Create a ledger entry based on the task at point. Task should match planner-ledger-payment-task-regexp.


Next: , Previous: Finances, Up: Managing Your Information

7.4 Contacts and Conversations

Planner has two modules available for keeping track of contact and conversation information. The first uses the Big Brother Database (BBDB), and the second uses Emacs Relay Chat (ERC). BBDB is a full contact database. ERC is a client for chatting online on Internet Relay Chat (IRC) networks. The ERC module for Planner will help you keep track of online conversations you have if you use ERC for those conversations, but does not by itself store contact information other than the time you had the conversation, the network and channel you were on when you had it, and maybe who you had it with. If you are looking for a way to manage your full address book, then planner-bbdb.el in combination with BBDB is what you are looking for.


Next: , Previous: Contacts and Conversations, Up: Contacts and Conversations

7.4.1 BBDB

planner-bbdb.el allows you to refer to your contacts easily from within a planner page. see the BBDB Manual.

[[bbdb://Sacha.*Chua][Sacha]]’, for example, will be linked to the blog, web or net fields of the first matching BBDB record.

planner-bbdb.el does not define any interactive functions, or keybindings.


Previous: BBDB, Up: Contacts and Conversations

7.4.2 Emacs Relay Chat

To use planner-erc, place planner-erc.el in your load path and add this to your .emacs (or _emacs):

     
     (require 'planner-erc)
     

IRC URLs may be of the following forms.

     irc://server/nick,isnick
     irc://server/#channel
     irc://server

Annotations will be in the following forms.

     [[irc://server/nick,isnick][Chat with nick on server#channel]]
     [[irc://server/nick,isnick][Chat with nick on server]]
     [[irc://server/#channel][Chat on server#channel]]
     [[irc://server][Chat on server]]

planner-erc.el does not define any interactive functions, or keybindings.


Next: , Previous: Contacts and Conversations, Up: Managing Your Information

7.5 Tracking Research and Resources

Planner provides three modules for keeping track of information involving three specific tools: w3m, BibTeX, and bookmark.el.


Next: , Previous: Tracking Research and Resources, Up: Tracking Research and Resources

7.5.1 W3m

This module allows you to create tasks from a w3m buffer.

planner-w3m.el does not define any interactive functions, or keybindings.


Next: , Previous: W3m, Up: Tracking Research and Resources

7.5.2 BibTeX

BibTeX URLs are of the form ‘bibtex:file/name:key’.

planner-bibtex.el does not define any interactive functions.


Previous: BibTeX, Up: Tracking Research and Resources

7.5.3 Bookmark

planner-bookmark.el uses the remember package to create a note whenever you create a bookmark (see see Bookmarks). For more information about remember, please check out

Configure remember according to the instructions in remember-planner.el so that notes are saved to your planner pages.

— User Option: planner-bookmark-take-note-after-set-bookmark-flag

Non-nil means show a remember buffer after setting a new bookmark.

When you create a bookmark, Emacs will open a buffer for your notes. C-c C-c saves the buffer to today's page. If you don't want to save a note, you can kill the buffer.

Bookmark URLs are of the form ‘bookmark://bookmark-name’.

planner-bookmark.el does not define any interactive functions.


Previous: Tracking Research and Resources, Up: Managing Your Information

7.6 Tracking Development

Planner has three modules geared toward programmers. Two modules deal with version control and integrating information from those projects into the planner page. One module deals with the Gnats bug-tracking system.


Next: , Previous: Tracking Development, Up: Tracking Development

7.6.1 Log Edit

This module allows you to automatically record CVS (and VC) commits in today's page.

You can load the module with (require 'planner-log-edit). When you load the module, planner-log-edit-add-note will be added to log-edit-done-hook. A note containing the text of the commit and optionally a list of modified files will be added to today's page if you use the the Emacs version control interface. (see Version Control)

Options

— User Option: planner-log-edit-include-files-flag

Non-nil means include a list of committed files in the note.

— User Option: planner-log-edit-notice-commit-function

Non-nil means include a list of committed files in the note. If you want to enable this feature for some projects but not for others, set this to a function that returns t only for the commits you want to note.

planner-log-edit.el does not define any interactive functions.


Next: , Previous: Log Edit, Up: Tracking Development

7.6.2 PSVN

This module enables you to refer to your Subversion (svn) changesets easily from within a Planner page, and to have your svn commits recorded automatically as notes in your planner.

You must also have psvn.el, which is often packaged with Subversion in GNU/Linux distributions.

You can then load the module by adding (require 'planner-psvn) to your ~/.emacs.

Once the module is loaded, Planner will pick up annotation information from any psvn *svn-log-view* buffer. If you create a task or note while in such a buffer, that task will have a hyperlink you can follow to return to the changeset later.

These hyperlinks are of the form ‘psvn://http://my.svn-repos.at/svn/project1/trunk@39

Additionally, you can have notes for your commits automatically generated. Set planner-psvn-log-edit-notice-commit-function to t to enable this.

By default, these commit notes will include a list of the files modified. If you would prefer to have this list not included, set planner-psvn-log-edit-include-files-flag to nil.


Next: , Previous: PSVN, Up: Tracking Development

7.6.3 XTLA

This module allows you to refer to changesets in Tom Lord's Arch (tla) version control system. You can load the module with (require 'planner-xtla). When you load the module, you can create tasks from XTLA windows by positioning point on a revision.

XTLA URLs are of the form ‘xtla://miles@gnu.org--gnu-2005/emacs--cvs-trunk--0--patch-19

planner-xtla.el does not define any interactive functions.


Previous: XTLA, Up: Tracking Development

7.6.4 Gnats

planner-gnats.el provides support for the GNU problem report management system Gnats. This module allows you to refer to problem reports using hyperlinks.

Configure your Emacs for Gnats access, then add ‘(require 'planner-gnats)’ to your .emacs. You can then create tasks from Gnats edit or view buffers.

To add keybindings to Gnats, use ‘(planner-gnats-insinuate)’.

Gnats URLs are of the form ‘gnats:pr-number’.

planner-gnats.el does not define any interactive functions.


Next: , Previous: Managing Your Information, Up: Top

8 Advanced Configuration


Next: , Previous: Advanced Configuration, Up: Advanced Configuration

8.1 Customizing Your Day Pages

With the variable planner-day-page-template, you can define how you want any newly created day planner pages to look.

You might want to include a section for your diary entries. For how to do this, see Diary.

You can add interactive Lisp buttons with the planner-lisp.el module. (see Interactive Lisp)

Your planner-day-page-template can also include ‘|<lisp>|’ tags.

For more complex day pages, you can set planner-day-page-template to a function that will be called from an empty day page buffer. The function should initialize the contents of the day page.


Next: , Previous: Customizing Your Day Pages, Up: Advanced Configuration

8.2 Variables to Customize

You can use Customize (M-x customize-group RET planner RET) to set user variables.

Other user options are:

— User Option: planner-use-day-pages

If you really don't like day pages, you can set this variable to nil and you won't be prompted for dates for tasks (and notes, if using remember-planner).

— User Option: planner-use-plan-pages

If you really don't like plan pages, you can set this variable to nil and you won't be prompted for plan pages for tasks (and notes, if using remember-planner).

— User Option: planner-mode-hook

List of functions to run after planner-mode is initialized.

— User Option: planner-tasks-file-behavior

This variable controls what happens to files Planner opens by itself. If your tasks are associated with plan pages, the plan pages are updated whenever a task is rescheduled. This could lead to a lot of open buffers as Planner applies updates to all linked files. By default, Planner is configured to do nothing. A value of ‘save’ means save but do not close buffers, and a value of ‘nil’ means do not save any of the buffers.

— User Option: planner-add-task-at-end-flag

This variable controls where new tasks are created. Non-nil means create tasks at the bottom of the first task block. If you set this to non-nil, new tasks will be listed in order of creation (oldest). Tasks carried over from previous days will appear at the bottom of the list.

Nil means create tasks at the top of the first task block. Carried-over tasks and newly created tasks are prominently placed on top of the list of tasks for the day.

— User Option: planner-default-page

Default page for created tasks. This is used as the initial value for tasks. After you create a task, it will be set to the previous page used.

— User Option: planner-hide-task-status-when-highlighting

Font-locking for tasks may be enough for you to determine status and priority. Set this to non-nil if you want to hide the status marker and rely on font-locking instead.

— User Option: planner-create-task-hook

Functions run after creating a task. planner-id hooks into this.

— User Option: planner-expand-name-favor-future-p

If non-nil, partial dates (ex: 2 or 5.2) are completed to dates in the future instead of using the current year and month.

— User Option: planner-task-dates-favor-future-p

Like planner-expand-name-favor-future-p, but only for tasks.

— User Option: planner-publish-dates-first-p

Non-nil means list day pages first in the planner index.


Previous: Variables to Customize, Up: Advanced Configuration

8.3 Ideas for Other Keybindings

By default and for backward compatibility, the following operations do not have keybindings, and are only accessible from the Planner menu:

You may find it easier to install keybindings for those operations by inserting the following in your .emacs (or _emacs). Note: This changes some of the default keybindings for Planner.

     (planner-install-extra-task-keybindings)

If you install the extra task keybindings, your keybindings will include:

Other keybindings can be configured by adding this to your .emacs (or _emacs):

     (planner-install-extra-context-keybindings)

This will set up the following keybindings:


Next: , Previous: Advanced Configuration, Up: Top

9 Reference Material


Next: , Previous: Reference Material, Up: Reference Material

9.1 Keeping Track of Time

One of the coolest things you can do with Planner is keep track of how much time you spend not only on projects but even on particular tasks. planner-timeclock.el makes it as easy and natural as marking a task as in progress, postponed, or done. This can help you determine just how much time you spend working each day. If you add estimates to your task descriptions, you'll also be able to use this information to improve your time estimation skills.

For example, I had converted the TODO my teammate sent me into entries in my JapanProject plan page, and before starting my work I came up with rough estimates of the time it would take me to do the tasks. I also marked which tasks I felt were best suited for my coworker so that he could get started without worrying about conflicts. I like working on little tasks first, so I estimated the time it would take me to complete each task and sorted by my estimates using the sort command and some cutting and pasting.

Then the fun began. I wanted to see if I could match my estimates. Before I started working on a task, I used C-c TAB to mark it in progress and start the clock. If I decided to work on something else, I used C-c TAB to clock out of the previous task and clock into the new one.

When I finished it, I used C-c C-x (planner-task-done) to mark it completed and automatically clock out. This is not yet done for cancelled tasks, so I clocked out of those manually with C-c C-o (timeclock-out). I also clocked out whenever I caught myself being distracted so that the totals wouldn't include the time I spent chatting on #emacs or checking out del.icio.us links. =) At the end of the day, I used planner-timeclock-summary-show-range-filter to show me the time elapsed for all of the tasks I'd worked on over the past two days. Here's the report for that project, edited to reflect how it looks on my screen and annotated with comments:

     Timeclock summary report for 2004.12.28 - 2004.12.29
     
     Project     |     Time| Ratio| Task
     JapanProject|  0:23:17|  3.6%| Translate javadoc comment for Messages.java
                 |  0:33:48|  5.3%| Translate javadoc comment for LoginAction.java
                 |  1:54:07| 17.8%| Study Struts in Japanese
                 |  0:46:08|  7.2%| Add javadoc tags for input, output and forwards
                 |  1:03:48|  9.9%| Help review code
                 |  0:04:14|  0.7%| Import todo list
                 |  0:00:37|  0.1%| 2min       Fix Menu Action's unnecessary code - delegated
                 |  0:01:01|  0.2%| 2min       Remove unnecessary list in UserRemoveSetupAction - cancelled
                 |  0:02:10|  0.3%| 2min       Remove hard-coded database path from MenuAction
                 |  0:02:46|  0.4%| 30min      Create a superclass for our action classes that handles initialization of database and handling of privileges - remove all privilege handling in logic classes. ...
                 |  0:07:32|  1.2%| 5min       Add a method that returns the validity of a user in MUserPeer.
                 |  0:08:28|  1.3%| 5min       Fix indentation
                 |  0:03:52|  0.6%| 10min      Fix UserPeer so that it doesn't get null pointer exceptions
                 |  0:04:34|  0.7%| 5min       Add current password field in user_modify page
                 |  0:21:56|  3.4%| 15min      Make a super class for our service classes that will receive the database connection. (cancelled)
                 |  0:06:05|  0.9%| 10min      Remove hard-coded constants from the Logic classes
                 |  0:10:55|  1.7%| 10min      Move logic from UserBean.checkPassword to UserListLogic
                 |  0:01:20|  0.2%| 20min      Guard against null pointer exceptions in peer classes
                 |  0:04:57|  0.8%| 10min      Instead of displaying uneditable data with bean:write, just disable the html:text element
                 |  0:25:03|  3.9%| 10min      Deploy 10:00 version
                 |  0:04:46|  0.7%| 5min       Separate the configuration file of database and system into another uninternationalized property file.
                 |  2:09:48| 20.2%| 1h         Decide on a naming convention for localized messages and update files
                 |  0:00:07|  0.0%| 20min      Explain what is happening in UserModifyAction's nested ifs - pending
                 |  1:50:23| 17.2%| 2h         Write Javadoc comments in English and Japanese to explain bean structure
                 |  0:04:19|  0.7%| 2h         Write Javadoc comments in English and Japanese to explain peer operations (pending)
                 |  0:05:40|  0.9%| 20min      Make a factory class for the database - pending
          Total: | 10:41:41|100.0%|
     
     Day began: 13:03:58, Day ended: 20:51:46
     Time elapsed: 31:47:48, Time clocked: 10:41:41
     Time clocked ratio: 33.6%

The time record isn't perfect. I cancelled some tasks after thinking about them a little and did some tasks simultaneously. Sometimes I didn't notice that I was getting distracted, too. Still, having all of that time information neatly summarized made me realize a number of things.

First, I goof off much less when I have a nice, broken-down task list in front of me. There's just something about knowing there's a five- or ten-minute hack you can get out of the way. I found myself looking forward to getting to the next task just to see if I could make my estimate. That said, seeing a five-minute task stretch and stretch due to unforeseen problems did make me a little nervous. I should probably just make generous estimates so that I don't end up with bugs because of haste.

Second, I don't goof off as much as I thought I did, although there's still room for improvement. Yesterday's workday was 9:00 - 12:00, 1:00 - 5:30–7.5 hours. Today was the last day of work, so cleaning and celebration interrupted my hacking at around 3:00–5 hours of work. According to my task list, 10:41/12:30 was productive work. Hmm. 1:49 hours unclocked time when I was thinking or goofing off. planner-timeclock-summary-show for today reveals that I actually clocked 5:30 today, which means the goofing off happened yesterday. That makes sense; I remember a pretty long unclocked segment recuperating from Japanese overload. (This was before we came up with the task list.)

Third, keeping track of time is way, way cool even if you don't bill anyone for your time.

Like the idea? It's easy to try out. Just add

     (require 'planner-timeclock)
     (require 'planner-timeclock-summary)

to your ~/.emacs. If you want to try it out now, eval those statements in your Emacs session. After that, simply use C-c TAB to “clock in” a task before you start working on it and C-c C-x (planner-task-done) to mark it completed. M-x planner-task-pending also clocks out the current task if it was clocked in. To see a summary of how you spent your day, check out the different functions in planner-timeclock-summary.

See Timeclock for more details.

Happy hacking!


Next: , Previous: Keeping Track of Time, Up: Reference Material

9.2 Other Interactive Functions

With planner.el loaded, you can use any of the functions in this section by typing M-x followed by the name of the function. Many of these functions are also bound to keys.

For a list of Planner keybindings, see Planner Keybindings.

They are listed in no particular order.

planner.el defines the following interactive functions:

— Function: planner-create-high-priority-task-from-buffer

Create a high priority task based on this buffer. Do not use this in LISP programs. Instead, set the value of planner-default-task-priority and call planner-create-task or planner-create-task-from-buffer.

— Function: defun planner-create-medium-priority-task-from-buffer

Create a medium-priority task based on this buffer. Do not use this in LISP programs. Instead, set the value of planner-default-task-priority and call planner-create-task or planner-create-task-from-buffer.

— Function: planner-create-low-priority-task-from-buffer

Create a high-priority task based on this buffer. Do not use this in LISP programs. Instead, set the value of planner-default-task-priority and call planner-create-task or planner-create-task-from-buffer.

— Function: planner-install-extra-context-keybindings

Install extra context-sensitive keybindings. These keybindings conflict with windmove.el, but might be useful.

— Function: planner-narrow-to-section section &optional create

Widen to the whole page and narrow to the section labelled section. If create is non-nil and the section is not found, the section is created. Return non-nil if section was found or created.

— Function: planner-save-buffers

Save all planner-mode buffers.

— Function: planner-seek-to-first section

Positions the point at the specified section, or ‘Tasks’ if not specified.

— Function: planner-save-buffers

Save all planner buffers.

— Function: planner-calendar-insinuate

This hooks Planner into Emacs Calendar (see Calendar/Diary).

It adds special planner key bindings to calendar-mode-map. After this function is evaluated, you can use the following planner-related keybindings in calendar-mode-map:

n
Jump to the planner page for the current day.
N
Display the planner page for the current day.
— Function: planner-kill-calendar-files

Remove planner files shown from Calendar (see Calendar/Diary).

— Function: planner-calendar-goto

Goto the plan page corresponding to the calendar date (see Calendar/Diary).

— Function: planner-calendar-show

Show the plan page for the calendar date under point in another window (see Calendar/Diary).

— Function: planner-calendar-select

Return to planner-read-date with the date currently selected (see Calendar/Diary).

— Function: planner-jump-to-link

Jump to the item linked to by the current item.

— Function: planner-move-up

Move a task up. You can use this to indicate that you will do a task before another one. On a note, go to the previous note. On a headline, go to the previous headline of the same depth.

— Function: planner-move-down

Move down. You can use this to indicate that you will do a task after another one. On a note, go to the next note. On a headline, go to the next headline of the same depth.


Next: , Previous: Other Interactive Functions, Up: Reference Material

9.3 Planner Keybindings

In order to refresh and renumber all of your tasks according to their actual order in the buffer, simply save the file or call M-x planner-renumber-tasks.

Here is a summary of the keystrokes available:

M-x plan
Begin your planning session. This goes to the last day for which there is any planning info (or today if none), allowing you to review, and create/move tasks from that day.
C-c C-u
Move a task up.
C-c C-d
Move a task down.
C-c C-s
Mark the task as in progress or delegated.
C-c C-x
Mark the task as finished.
C-c C-t
Create a task associated with the current Wiki page. If you are on the opening line of a Note entry, it is assumed that the note itself is the origin of the task.
C-c C-c
Move or copy the current task to another date. If the current task is an original (meaning you are in the buffer where's defined, hopefully a planning page) then it will be copied, and the original task will also now point to the copy. If the current task is a copy, it will just be moved to the new day, and the original task's link will be updated.
C-c C-n
Jump to today's task page. If you call (planner-calendar-insinuate), typing n in the Emacs calendar (see Calendar/Diary) will jump to today's task page.
C-c C-x
planner-task-done
C-c C-z
planner-task-in-progress
C-c C-d
planner-lower-task
C-c C-u
planner-raise-task
C-c C-c
planner-copy-or-move-task
C-c C-t
planner-create-task-from-buffer
C-c C-j
This is a prefix command.
C-c C-n
planner-goto-today
C-c C-j C-r
planner-goto-most-recent
C-c C-j C-t
planner-goto-tomorrow
C-c C-j C-y
planner-goto-yesterday
C-c C-j C-j
planner-goto-today
C-c C-j C-n
planner-goto-next-daily-page
C-c C-j C-p
planner-goto-previous-daily-page
C-c C-j C-d
planner-goto


Previous: Planner Keybindings, Up: Reference Material

9.4 Sample Configuration Files

This section includes some sample configuration files. This way, once you've got the hang of the basics, you can see some different, more advanced, setups.

There is no One True Way to plan. Every person is different. We hope you'll find a good starting point among the example configurations below. If what you want to do does not perfectly fit under one of these examples, please post a description of the way you plan to our mailing list (see Getting Help). We look forward to helping you customizing planner to fit your needs.


Next: , Previous: Sample Configuration Files, Up: Sample Configuration Files

9.4.1 File Organization


Next: , Previous: File Organization, Up: Sample Configuration Files

9.4.2 Bare-Bones Planning

You can keep all of your tasks, notes and schedules in a single file: WelcomePage. This is good for people who are used to storing all of their information in a flat text file. By storing your information in planner, you'll be able to take advantage of automatic hyperlinking to files and other resources. You can also sort your tasks by priority and status.

To set your system up for bare-bones planning, set the planner-use-day-pages variable to nil before loading planner. For example, you can put this in your ~/.emacs (or _emacs):

     (setq planner-use-day-pages nil)
     (setq planner-default-page nil)
     (require 'planner)

When you create a task or note, planner will not prompt you for a date. If you press <RET> when prompted for a plan page, it will accept the default of nil, so no other plan pages will be used. All of your data will be kept in one file, which can then be easily backed up.

You can use commands like planner-create-task-from-buffer to create tasks, or you can type tasks in manually. You can edit or delete anything in the page without having to update other files.


Next: , Previous: Bare-Bones Planning, Up: Sample Configuration Files

9.4.3 Bare-Bones Planning with Plan Pages

When you create a task or note, Planner.el can copy this to a plan page. Plan pages allow you to see an overview of all the data for a project.

For convenience, the planner-create-task-from-buffer command prompts you for a plan page when you create a task.


Next: , Previous: Bare-Bones Planning with Plan Pages, Up: Sample Configuration Files

9.4.4 Tasks on Plan Pages with Some Day Pages

If most of your tasks are associated with plan pages but you want to schedule some tasks on day pages, you can leave day pages on (default) and then write a function that turns off day pages. For example, the following code snippet turns off day pages for task creation from buffers.

     (require 'planner)
     
     (defun my-planner-create-task-from-buffer ()
       "Call `planner-create-task-from-buffer', but without dates."
       (interactive)
       (let ((planner-use-day-pages nil))
         (call-interactively 'planner-create-task-from-buffer)))


Previous: Tasks on Plan Pages with Some Day Pages, Up: Sample Configuration Files

9.4.5 Hierarchical Tasks

You can use allout.el or other modes for outlining to support hierarchical tasks in plan pages. No special support is needed.

Tasks created by planner-create-task-from-buffer and planner-create-task are created in the ‘* Tasks’ section. If planner-add-task-at-end-flag is non-nil, tasks are added to the end of the first task block, else they are added to the beginning. You can then copy and paste tasks into your preferred hierarchy. Blank lines delimit blocks of tasks upon which automatic sorting is performed.

You can also type in tasks manually. You may find this approach faster when you are comfortable with planner.

For example, a LearnPlanner plan page might contain the following lines:

     * Learn how to use planner.el
     
     ** Installation
     
     #C0 _ Decide where to put Planner
     #C0 _ Download the archives
     
     ** Configuration
     
     *** Load path
     
     #C0 _ Figure out how to add things to my load path
     #C0 _ Actually add it to my load path
     
     ...

If you create tasks for the finest level of detail available at the moment, you can schedule them onto day pages with C-c C-c (planner-copy-or-move-task). Then you can use planner-jump-to-link to switch between the day page and the plan page link.


Next: , Previous: Reference Material, Up: Top

10 Getting Help

After you have read this guide, if you still have questions about Planner, or if you have bugs to report, there are several places you can go.

Planner has an official website at http://www.emacswiki.org/cgi-bin/wiki/PlannerMode. It is a collaborative wiki.

Bugs may be reported using the Planner Bug-Tracker at http://gna.org/bugs/?group=planner-el.

Planner has three mailing lists.

planner-el-announce
Low-traffic list for planner-related announcements.

You can join this mailing list (planner-el-announce@gna.org) using the subscription form at http://mail.gna.org/listinfo/planner-el-announce/. This mailing list is also available via Gmane (http://gmane.org/). The group is called ‘gmane.emacs.planner.announce’.

planner-el-discuss
Discussion, bugfixes, suggestions, tips, and the like for Planner. This mailing list also includes the content of planner-el-announce.

You can join this mailing list (planner-el-discuss@gna.org) using the subscription form at http://mail.gna.org/listinfo/planner-el-discuss/. This mailing list is also available via Gmane with the identifier ‘gmane.emacs.planner.general’.

planner-el-logs
Log messages for commits made to Planner.

You can join this mailing list (planner-el-logs@gna.org) using the subscription form at http://mail.gna.org/listinfo/planner-el-logs/. This mailing list is also available via Gmane with the identifier ‘gmane.emacs.planner.scm’.

planner-el-cvs
Generated bug reports for Planner.

You can join this mailing list (planner-el-cvs@gna.org) using the subscription form at http://mail.gna.org/listinfo/planner-el-cvs/. This mailing list is also available via Gmane with the identifier ‘gmane.emacs.planner.cvs’.

You can also contact the maintainer of Planner, John Sullivan, at john@wjsullivan.net, but it is better to use the other options.

You can explore the relevant sections of the EmacsWiki.org:

You can visit the IRC Freenode channel ‘#emacs’. Many of the contributors are frequently around and willing to answer your questions.

There is an Orkut community called PlannerMode.

For issues relating to this documentation, please contact John Sullivan at john@wjsullivan.net.


Next: , Previous: Getting Help, Up: Top

11 Acknowledgements


Next: , Previous: Acknowledgements, Up: Top

Appendix A GNU GENERAL PUBLIC LICENSE

Version 2, June 1991

Version 3, 29 June 2007
     Copyright © 2007 Free Software Foundation, Inc. http://fsf.org/
     
     Everyone is permitted to copy and distribute verbatim copies of this
     license document, but changing it is not allowed.

Preamble

The GNU General Public License is a free, copyleft license for software and other kinds of works.

The licenses for most software and other practical works are designed to take away your freedom to share and change the works. By contrast, the GNU General Public License is intended to guarantee your freedom to share and change all versions of a program—to make sure it remains free software for all its users. We, the Free Software Foundation, use the GNU General Public License for most of our software; it applies also to any other work released this way by its authors. You can apply it to your programs, too.

When we speak of free software, we are referring to freedom, not price. Our General Public Licenses are designed to make sure that you have the freedom to distribute copies of free software (and charge for them if you wish), that you receive source code or can get it if you want it, that you can change the software or use pieces of it in new free programs, and that you know you can do these things.

To protect your rights, we need to prevent others from denying you these rights or asking you to surrender the rights. Therefore, you have certain responsibilities if you distribute copies of the software, or if you modify it: responsibilities to respect the freedom of others.

For example, if you distribute copies of such a program, whether gratis or for a fee, you must pass on to the recipients the same freedoms that you received. You must make sure that they, too, receive or can get the source code. And you must show them these terms so they know their rights.

Developers that use the GNU GPL protect your rights with two steps: (1) assert copyright on the software, and (2) offer you this License giving you legal permission to copy, distribute and/or modify it.

For the developers' and authors' protection, the GPL clearly explains that there is no warranty for this free software. For both users' and authors' sake, the GPL requires that modified versions be marked as changed, so that their problems will not be attributed erroneously to authors of previous versions.

Some devices are designed to deny users access to install or run modified versions of the software inside them, although the manufacturer can do so. This is fundamentally incompatible with the aim of protecting users' freedom to change the software. The systematic pattern of such abuse occurs in the area of products for individuals to use, which is precisely where it is most unacceptable. Therefore, we have designed this version of the GPL to prohibit the practice for those products. If such problems arise substantially in other domains, we stand ready to extend this provision to those domains in future versions of the GPL, as needed to protect the freedom of users.

Finally, every program is threatened constantly by software patents. States should not allow patents to restrict development and use of software on general-purpose computers, but in those that do, we wish to avoid the special danger that patents applied to a free program could make it effectively proprietary. To prevent this, the GPL assures that patents cannot be used to render the program non-free.

The precise terms and conditions for copying, distribution and modification follow.

TERMS AND CONDITIONS

  1. Definitions.

    “This License” refers to version 3 of the GNU General Public License.

    “Copyright” also means copyright-like laws that apply to other kinds of works, such as semiconductor masks.

    “The Program” refers to any copyrightable work licensed under this License. Each licensee is addressed as “you”. “Licensees” and “recipients” may be individuals or organizations.

    To “modify” a work means to copy from or adapt all or part of the work in a fashion requiring copyright permission, other than the making of an exact copy. The resulting work is called a “modified version” of the earlier work or a work “based on” the earlier work.

    A “covered work” means either the unmodified Program or a work based on the Program.

    To “propagate” a work means to do anything with it that, without permission, would make you directly or secondarily liable for infringement under applicable copyright law, except executing it on a computer or modifying a private copy. Propagation includes copying, distribution (with or without modification), making available to the public, and in some countries other activities as well.

    To “convey” a work means any kind of propagation that enables other parties to make or receive copies. Mere interaction with a user through a computer network, with no transfer of a copy, is not conveying.

    An interactive user interface displays “Appropriate Legal Notices” to the extent that it includes a convenient and prominently visible feature that (1) displays an appropriate copyright notice, and (2) tells the user that there is no warranty for the work (except to the extent that warranties are provided), that licensees may convey the work under this License, and how to view a copy of this License. If the interface presents a list of user commands or options, such as a menu, a prominent item in the list meets this criterion.

  2. Source Code.

    The “source code” for a work means the preferred form of the work for making modifications to it. “Object code” means any non-source form of a work.

    A “Standard Interface” means an interface that either is an official standard defined by a recognized standards body, or, in the case of interfaces specified for a particular programming language, one that is widely used among developers working in that language.

    The “System Libraries” of an executable work include anything, other than the work as a whole, that (a) is included in the normal form of packaging a Major Component, but which is not part of that Major Component, and (b) serves only to enable use of the work with that Major Component, or to implement a Standard Interface for which an implementation is available to the public in source code form. A “Major Component”, in this context, means a major essential component (kernel, window system, and so on) of the specific operating system (if any) on which the executable work runs, or a compiler used to produce the work, or an object code interpreter used to run it.

    The “Corresponding Source” for a work in object code form means all the source code needed to generate, install, and (for an executable work) run the object code and to modify the work, including scripts to control those activities. However, it does not include the work's System Libraries, or general-purpose tools or generally available free programs which are used unmodified in performing those activities but which are not part of the work. For example, Corresponding Source includes interface definition files associated with source files for the work, and the source code for shared libraries and dynamically linked subprograms that the work is specifically designed to require, such as by intimate data communication or control flow between those subprograms and other parts of the work.

    The Corresponding Source need not include anything that users can regenerate automatically from other parts of the Corresponding Source.

    The Corresponding Source for a work in source code form is that same work.

  3. Basic Permissions.

    All rights granted under this License are granted for the term of copyright on the Program, and are irrevocable provided the stated conditions are met. This License explicitly affirms your unlimited permission to run the unmodified Program. The output from running a covered work is covered by this License only if the output, given its content, constitutes a covered work. This License acknowledges your rights of fair use or other equivalent, as provided by copyright law.

    You may make, run and propagate covered works that you do not convey, without conditions so long as your license otherwise remains in force. You may convey covered works to others for the sole purpose of having them make modifications exclusively for you, or provide you with facilities for running those works, provided that you comply with the terms of this License in conveying all material for which you do not control copyright. Those thus making or running the covered works for you must do so exclusively on your behalf, under your direction and control, on terms that prohibit them from making any copies of your copyrighted material outside their relationship with you.

    Conveying under any other circumstances is permitted solely under the conditions stated below. Sublicensing is not allowed; section 10 makes it unnecessary.

  4. Protecting Users' Legal Rights From Anti-Circumvention Law.

    No covered work shall be deemed part of an effective technological measure under any applicable law fulfilling obligations under article 11 of the WIPO copyright treaty adopted on 20 December 1996, or similar laws prohibiting or restricting circumvention of such measures.

    When you convey a covered work, you waive any legal power to forbid circumvention of technological measures to the extent such circumvention is effected by exercising rights under this License with respect to the covered work, and you disclaim any intention to limit operation or modification of the work as a means of enforcing, against the work's users, your or third parties' legal rights to forbid circumvention of technological measures.

  5. Conveying Verbatim Copies.

    You may convey verbatim copies of the Program's source code as you receive it, in any medium, provided that you conspicuously and appropriately publish on each copy an appropriate copyright notice; keep intact all notices stating that this License and any non-permissive terms added in accord with section 7 apply to the code; keep intact all notices of the absence of any warranty; and give all recipients a copy of this License along with the Program.

    You may charge any price or no price for each copy that you convey, and you may offer support or warranty protection for a fee.

  6. Conveying Modified Source Versions.

    You may convey a work based on the Program, or the modifications to produce it from the Program, in the form of source code under the terms of section 4, provided that you also meet all of these conditions:

    1. The work must carry prominent notices stating that you modified it, and giving a relevant date.
    2. The work must carry prominent notices stating that it is released under this License and any conditions added under section 7. This requirement modifies the requirement in section 4 to “keep intact all notices”.
    3. You must license the entire work, as a whole, under this License to anyone who comes into possession of a copy. This License will therefore apply, along with any applicable section 7 additional terms, to the whole of the work, and all its parts, regardless of how they are packaged. This License gives no permission to license the work in any other way, but it does not invalidate such permission if you have separately received it.
    4. If the work has interactive user interfaces, each must display Appropriate Legal Notices; however, if the Program has interactive interfaces that do not display Appropriate Legal Notices, your work need not make them do so.

    A compilation of a covered work with other separate and independent works, which are not by their nature extensions of the covered work, and which are not combined with it such as to form a larger program, in or on a volume of a storage or distribution medium, is called an “aggregate” if the compilation and its resulting copyright are not used to limit the access or legal rights of the compilation's users beyond what the individual works permit. Inclusion of a covered work in an aggregate does not cause this License to apply to the other parts of the aggregate.

  7. Conveying Non-Source Forms.

    You may convey a covered work in object code form under the terms of sections 4 and 5, provided that you also convey the machine-readable Corresponding Source under the terms of this License, in one of these ways:

    1. Convey the object code in, or embodied in, a physical product (including a physical distribution medium), accompanied by the Corresponding Source fixed on a durable physical medium customarily used for software interchange.
    2. Convey the object code in, or embodied in, a physical product (including a physical distribution medium), accompanied by a written offer, valid for at least three years and valid for as long as you offer spare parts or customer support for that product model, to give anyone who possesses the object code either (1) a copy of the Corresponding Source for all the software in the product that is covered by this License, on a durable physical medium customarily used for software interchange, for a price no more than your reasonable cost of physically performing this conveying of source, or (2) access to copy the Corresponding Source from a network server at no charge.
    3. Convey individual copies of the object code with a copy of the written offer to provide the Corresponding Source. This alternative is allowed only occasionally and noncommercially, and only if you received the object code with such an offer, in accord with subsection 6b.
    4. Convey the object code by offering access from a designated place (gratis or for a charge), and offer equivalent access to the Corresponding Source in the same way through the same place at no further charge. You need not require recipients to copy the Corresponding Source along with the object code. If the place to copy the object code is a network server, the Corresponding Source may be on a different server (operated by you or a third party) that supports equivalent copying facilities, provided you maintain clear directions next to the object code saying where to find the Corresponding Source. Regardless of what server hosts the Corresponding Source, you remain obligated to ensure that it is available for as long as needed to satisfy these requirements.
    5. Convey the object code using peer-to-peer transmission, provided you inform other peers where the object code and Corresponding Source of the work are being offered to the general public at no charge under subsection 6d.

    A separable portion of the object code, whose source code is excluded from the Corresponding Source as a System Library, need not be included in conveying the object code work.

    A “User Product” is either (1) a “consumer product”, which means any tangible personal property which is normally used for personal, family, or household purposes, or (2) anything designed or sold for incorporation into a dwelling. In determining whether a product is a consumer product, doubtful cases shall be resolved in favor of coverage. For a particular product received by a particular user, “normally used” refers to a typical or common use of that class of product, regardless of the status of the particular user or of the way in which the particular user actually uses, or expects or is expected to use, the product. A product is a consumer product regardless of whether the product has substantial commercial, industrial or non-consumer uses, unless such uses represent the only significant mode of use of the product.

    “Installation Information” for a User Product means any methods, procedures, authorization keys, or other information required to install and execute modified versions of a covered work in that User Product from a modified version of its Corresponding Source. The information must suffice to ensure that the continued functioning of the modified object code is in no case prevented or interfered with solely because modification has been made.

    If you convey an object code work under this section in, or with, or specifically for use in, a User Product, and the conveying occurs as part of a transaction in which the right of possession and use of the User Product is transferred to the recipient in perpetuity or for a fixed term (regardless of how the transaction is characterized), the Corresponding Source conveyed under this section must be accompanied by the Installation Information. But this requirement does not apply if neither you nor any third party retains the ability to install modified object code on the User Product (for example, the work has been installed in ROM).

    The requirement to provide Installation Information does not include a requirement to continue to provide support service, warranty, or updates for a work that has been modified or installed by the recipient, or for the User Product in which it has been modified or installed. Access to a network may be denied when the modification itself materially and adversely affects the operation of the network or violates the rules and protocols for communication across the network.

    Corresponding Source conveyed, and Installation Information provided, in accord with this section must be in a format that is publicly documented (and with an implementation available to the public in source code form), and must require no special password or key for unpacking, reading or copying.

  8. Additional Terms.

    “Additional permissions” are terms that supplement the terms of this License by making exceptions from one or more of its conditions. Additional permissions that are applicable to the entire Program shall be treated as though they were included in this License, to the extent that they are valid under applicable law. If additional permissions apply only to part of the Program, that part may be used separately under those permissions, but the entire Program remains governed by this License without regard to the additional permissions.

    When you convey a copy of a covered work, you may at your option remove any additional permissions from that copy, or from any part of it. (Additional permissions may be written to require their own removal in certain cases when you modify the work.) You may place additional permissions on material, added by you to a covered work, for which you have or can give appropriate copyright permission.

    Notwithstanding any other provision of this License, for material you add to a covered work, you may (if authorized by the copyright holders of that material) supplement the terms of this License with terms:

    1. Disclaiming warranty or limiting liability differently from the terms of sections 15 and 16 of this License; or
    2. Requiring preservation of specified reasonable legal notices or author attributions in that material or in the Appropriate Legal Notices displayed by works containing it; or
    3. Prohibiting misrepresentation of the origin of that material, or requiring that modified versions of such material be marked in reasonable ways as different from the original version; or
    4. Limiting the use for publicity purposes of names of licensors or authors of the material; or
    5. Declining to grant rights under trademark law for use of some trade names, trademarks, or service marks; or
    6. Requiring indemnification of licensors and authors of that material by anyone who conveys the material (or modified versions of it) with contractual assumptions of liability to the recipient, for any liability that these contractual assumptions directly impose on those licensors and authors.

    All other non-permissive additional terms are considered “further restrictions” within the meaning of section 10. If the Program as you received it, or any part of it, contains a notice stating that it is governed by this License along with a term that is a further restriction, you may remove that term. If a license document contains a further restriction but permits relicensing or conveying under this License, you may add to a covered work material governed by the terms of that license document, provided that the further restriction does not survive such relicensing or conveying.

    If you add terms to a covered work in accord with this section, you must place, in the relevant source files, a statement of the additional terms that apply to those files, or a notice indicating where to find the applicable terms.

    Additional terms, permissive or non-permissive, may be stated in the form of a separately written license, or stated as exceptions; the above requirements apply either way.

  9. Termination.

    You may not propagate or modify a covered work except as expressly provided under this License. Any attempt otherwise to propagate or modify it is void, and will automatically terminate your rights under this License (including any patent licenses granted under the third paragraph of section 11).

    However, if you cease all violation of this License, then your license from a particular copyright holder is reinstated (a) provisionally, unless and until the copyright holder explicitly and finally terminates your license, and (b) permanently, if the copyright holder fails to notify you of the violation by some reasonable means prior to 60 days after the cessation.

    Moreover, your license from a particular copyright holder is reinstated permanently if the copyright holder notifies you of the violation by some reasonable means, this is the first time you have received notice of violation of this License (for any work) from that copyright holder, and you cure the violation prior to 30 days after your receipt of the notice.

    Termination of your rights under this section does not terminate the licenses of parties who have received copies or rights from you under this License. If your rights have been terminated and not permanently reinstated, you do not qualify to receive new licenses for the same material under section 10.

  10. Acceptance Not Required for Having Copies.

    You are not required to accept this License in order to receive or run a copy of the Program. Ancillary propagation of a covered work occurring solely as a consequence of using peer-to-peer transmission to receive a copy likewise does not require acceptance. However, nothing other than this License grants you permission to propagate or modify any covered work. These actions infringe copyright if you do not accept this License. Therefore, by modifying or propagating a covered work, you indicate your acceptance of this License to do so.

  11. Automatic Licensing of Downstream Recipients.

    Each time you convey a covered work, the recipient automatically receives a license from the original licensors, to run, modify and propagate that work, subject to this License. You are not responsible for enforcing compliance by third parties with this License.

    An “entity transaction” is a transaction transferring control of an organization, or substantially all assets of one, or subdividing an organization, or merging organizations. If propagation of a covered work results from an entity transaction, each party to that transaction who receives a copy of the work also receives whatever licenses to the work the party's predecessor in interest had or could give under the previous paragraph, plus a right to possession of the Corresponding Source of the work from the predecessor in interest, if the predecessor has it or can get it with reasonable efforts.

    You may not impose any further restrictions on the exercise of the rights granted or affirmed under this License. For example, you may not impose a license fee, royalty, or other charge for exercise of rights granted under this License, and you may not initiate litigation (including a cross-claim or counterclaim in a lawsuit) alleging that any patent claim is infringed by making, using, selling, offering for sale, or importing the Program or any portion of it.

  12. Patents.

    A “contributor” is a copyright holder who authorizes use under this License of the Program or a work on which the Program is based. The work thus licensed is called the contributor's “contributor version”.

    A contributor's “essential patent claims” are all patent claims owned or controlled by the contributor, whether already acquired or hereafter acquired, that would be infringed by some manner, permitted by this License, of making, using, or selling its contributor version, but do not include claims that would be infringed only as a consequence of further modification of the contributor version. For purposes of this definition, “control” includes the right to grant patent sublicenses in a manner consistent with the requirements of this License.

    Each contributor grants you a non-exclusive, worldwide, royalty-free patent license under the contributor's essential patent claims, to make, use, sell, offer for sale, import and otherwise run, modify and propagate the contents of its contributor version.

    In the following three paragraphs, a “patent license” is any express agreement or commitment, however denominated, not to enforce a patent (such as an express permission to practice a patent or covenant not to sue for patent infringement). To “grant” such a patent license to a party means to make such an agreement or commitment not to enforce a patent against the party.

    If you convey a covered work, knowingly relying on a patent license, and the Corresponding Source of the work is not available for anyone to copy, free of charge and under the terms of this License, through a publicly available network server or other readily accessible means, then you must either (1) cause the Corresponding Source to be so available, or (2) arrange to deprive yourself of the benefit of the patent license for this particular work, or (3) arrange, in a manner consistent with the requirements of this License, to extend the patent license to downstream recipients. “Knowingly relying” means you have actual knowledge that, but for the patent license, your conveying the covered work in a country, or your recipient's use of the covered work in a country, would infringe one or more identifiable patents in that country that you have reason to believe are valid.

    If, pursuant to or in connection with a single transaction or arrangement, you convey, or propagate by procuring conveyance of, a covered work, and grant a patent license to some of the parties receiving the covered work authorizing them to use, propagate, modify or convey a specific copy of the covered work, then the patent license you grant is automatically extended to all recipients of the covered work and works based on it.

    A patent license is “discriminatory” if it does not include within the scope of its coverage, prohibits the exercise of, or is conditioned on the non-exercise of one or more of the rights that are specifically granted under this License. You may not convey a covered work if you are a party to an arrangement with a third party that is in the business of distributing software, under which you make payment to the third party based on the extent of your activity of conveying the work, and under which the third party grants, to any of the parties who would receive the covered work from you, a discriminatory patent license (a) in connection with copies of the covered work conveyed by you (or copies made from those copies), or (b) primarily for and in connection with specific products or compilations that contain the covered work, unless you entered into that arrangement, or that patent license was granted, prior to 28 March 2007.

    Nothing in this License shall be construed as excluding or limiting any implied license or other defenses to infringement that may otherwise be available to you under applicable patent law.

  13. No Surrender of Others' Freedom.

    If conditions are imposed on you (whether by court order, agreement or otherwise) that contradict the conditions of this License, they do not excuse you from the conditions of this License. If you cannot convey a covered work so as to satisfy simultaneously your obligations under this License and any other pertinent obligations, then as a consequence you may not convey it at all. For example, if you agree to terms that obligate you to collect a royalty for further conveying from those to whom you convey the Program, the only way you could satisfy both those terms and this License would be to refrain entirely from conveying the Program.

  14. Use with the GNU Affero General Public License.

    Notwithstanding any other provision of this License, you have permission to link or combine any covered work with a work licensed under version 3 of the GNU Affero General Public License into a single combined work, and to convey the resulting work. The terms of this License will continue to apply to the part which is the covered work, but the special requirements of the GNU Affero General Public License, section 13, concerning interaction through a network will apply to the combination as such.

  15. Revised Versions of this License.

    The Free Software Foundation may publish revised and/or new versions of the GNU General Public License from time to time. Such new versions will be similar in spirit to the present version, but may differ in detail to address new problems or concerns.

    Each version is given a distinguishing version number. If the Program specifies that a certain numbered version of the GNU General Public License “or any later version” applies to it, you have the option of following the terms and conditions either of that numbered version or of any later version published by the Free Software Foundation. If the Program does not specify a version number of the GNU General Public License, you may choose any version ever published by the Free Software Foundation.

    If the Program specifies that a proxy can decide which future versions of the GNU General Public License can be used, that proxy's public statement of acceptance of a version permanently authorizes you to choose that version for the Program.

    Later license versions may give you additional or different permissions. However, no additional obligations are imposed on any author or copyright holder as a result of your choosing to follow a later version.

  16. Disclaimer of Warranty.

    THERE IS NO WARRANTY FOR THE PROGRAM, TO THE EXTENT PERMITTED BY APPLICABLE LAW. EXCEPT WHEN OTHERWISE STATED IN WRITING THE COPYRIGHT HOLDERS AND/OR OTHER PARTIES PROVIDE THE PROGRAM “AS IS” WITHOUT WARRANTY OF ANY KIND, EITHER EXPRESSED OR IMPLIED, INCLUDING, BUT NOT LIMITED TO, THE IMPLIED WARRANTIES OF MERCHANTABILITY AND FITNESS FOR A PARTICULAR PURPOSE. THE ENTIRE RISK AS TO THE QUALITY AND PERFORMANCE OF THE PROGRAM IS WITH YOU. SHOULD THE PROGRAM PROVE DEFECTIVE, YOU ASSUME THE COST OF ALL NECESSARY SERVICING, REPAIR OR CORRECTION.

  17. Limitation of Liability.

    IN NO EVENT UNLESS REQUIRED BY APPLICABLE LAW OR AGREED TO IN WRITING WILL ANY COPYRIGHT HOLDER, OR ANY OTHER PARTY WHO MODIFIES AND/OR CONVEYS THE PROGRAM AS PERMITTED ABOVE, BE LIABLE TO YOU FOR DAMAGES, INCLUDING ANY GENERAL, SPECIAL, INCIDENTAL OR CONSEQUENTIAL DAMAGES ARISING OUT OF THE USE OR INABILITY TO USE THE PROGRAM (INCLUDING BUT NOT LIMITED TO LOSS OF DATA OR DATA BEING RENDERED INACCURATE OR LOSSES SUSTAINED BY YOU OR THIRD PARTIES OR A FAILURE OF THE PROGRAM TO OPERATE WITH ANY OTHER PROGRAMS), EVEN IF SUCH HOLDER OR OTHER PARTY HAS BEEN ADVISED OF THE POSSIBILITY OF SUCH DAMAGES.

  18. Interpretation of Sections 15 and 16.

    If the disclaimer of warranty and limitation of liability provided above cannot be given local legal effect according to their terms, reviewing courts shall apply local law that most closely approximates an absolute waiver of all civil liability in connection with the Program, unless a warranty or assumption of liability accompanies a copy of the Program in return for a fee.

END OF TERMS AND CONDITIONS

How to Apply These Terms to Your New Programs

If you develop a new program, and you want it to be of the greatest possible use to the public, the best way to achieve this is to make it free software which everyone can redistribute and change under these terms.

To do so, attach the following notices to the program. It is safest to attach them to the start of each source file to most effectively state the exclusion of warranty; and each file should have at least the “copyright” line and a pointer to where the full notice is found.

     one line to give the program's name and a brief idea of what it does.
     Copyright (C) year name of author
     
     This program is free software: you can redistribute it and/or modify
     it under the terms of the GNU General Public License as published by
     the Free Software Foundation, either version 3 of the License, or (at
     your option) any later version.
     
     This program is distributed in the hope that it will be useful, but
     WITHOUT ANY WARRANTY; without even the implied warranty of
     MERCHANTABILITY or FITNESS FOR A PARTICULAR PURPOSE.  See the GNU
     General Public License for more details.
     
     You should have received a copy of the GNU General Public License
     along with this program.  If not, see http://www.gnu.org/licenses/.

Also add information on how to contact you by electronic and paper mail.

If the program does terminal interaction, make it output a short notice like this when it starts in an interactive mode:

     program Copyright (C) year name of author
     This program comes with ABSOLUTELY NO WARRANTY; for details type ‘show w’.
     This is free software, and you are welcome to redistribute it
     under certain conditions; type ‘show c’ for details.

The hypothetical commands ‘show w’ and ‘show c’ should show the appropriate parts of the General Public License. Of course, your program's commands might be different; for a GUI interface, you would use an “about box”.

You should also get your employer (if you work as a programmer) or school, if any, to sign a “copyright disclaimer” for the program, if necessary. For more information on this, and how to apply and follow the GNU GPL, see http://www.gnu.org/licenses/.

The GNU General Public License does not permit incorporating your program into proprietary programs. If your program is a subroutine library, you may consider it more useful to permit linking proprietary applications with the library. If this is what you want to do, use the GNU Lesser General Public License instead of this License. But first, please read http://www.gnu.org/philosophy/why-not-lgpl.html.